Tender Details
Particulars | Details |
---|---|
Title |
Repair Work Of Bisalpur Rasiyakhanpur Road To Kuwadanda Khanjanpur Road Km. 1 Hosipur Village Damaged Portion Due To Heavy Rain And Flood In Garra River In The Year 2024 (Cc And Drain Work At Abaadi Portion) In Distt. Shahjahanpur (Fin Year 2024 25)
|
Description |
Repair Work Of Bisalpur Rasiyakhanpur Road To Kuwadanda Khanjanpur Road Km. 1 Hosipur Village Damaged Portion Due To Heavy Rain And Flood In Garra River In The Year 2024 (Cc And Drain Work At Abaadi Portion) In Distt. Shahjahanpur (Fin Year 2024 25)
|
Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
Tender Id | 2025_CEBLY_1014788_1 |
Reference Number |
1135/12A Dt. 03-03-2025 |
Tender Fee | 944 |
EMD | 3.39 Lakh |
Tender Value | |
Place | SHAHJAHANPUR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1836124 |
Start Date | March 18, 2025 14:30 |
End Date |
24/03/2025 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of channelization of river and installation of geo-textile tube for protection of village hajiro from flood of fika river in tehsil jaspur under sdmf item. (reach- 0.00 km to 0.400 m)
Work of channelization of river and installation of geo-textile tube for protection of village hajiro from flood of fika river in tehsil jaspur under sdmf item. (reach- 0.00 km to 0.400 m)
Read moreRestoration of damaged portion due to laying of phe pipeline for the pmgsy road (wb-09-545) from kalinagar (maniktala stoppage) to hirapur (mrl-07) (ch. 0.00 km to 2.21 km) under uluberia-i block in the district of howrah
Restoration of damaged portion due to laying of phe pipeline for the pmgsy road (wb-09-545) from kalinagar (maniktala stoppage) to hirapur (mrl-07) (ch. 0.00 km to 2.21 km) under uluberia-i block in the district of howrah
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreSpecial repair work at bareilly shahjahanpur road to hareli road in distt. bareilly in year 2024-25.
Special repair work at bareilly shahjahanpur road to hareli road in distt. bareilly in year 2024-25.
Read moreConstruction work of 165.00 m cc road and drain from surajpal house to lokendra singh house in village shahpur abdulwari, block-chhajalat in district moradabad (mla-nidhi work)
Construction work of 165.00 m cc road and drain from surajpal house to lokendra singh house in village shahpur abdulwari, block-chhajalat in district moradabad (mla-nidhi work)
Read moreConstruction work of 176.00 m cc road and drain from somveer singh house to kake singh house in village sandalipur, block-chhajalat in district moradabad (mla-nidhi work)
Construction work of 176.00 m cc road and drain from somveer singh house to kake singh house in village sandalipur, block-chhajalat in district moradabad (mla-nidhi work)
Read moreConstruction work of 50.00 m cc road and drain from maharaj singh house to chamunda temple in village sadupura, block-chhajalat in district moradabad (mla-nidhi work)
Construction work of 50.00 m cc road and drain from maharaj singh house to chamunda temple in village sadupura, block-chhajalat in district moradabad (mla-nidhi work)
Read moreConstruction work of 125.00 m cc road and drain from the house of lokendra singh to the house of satpal singh in the village nidhi, block-chhajalat in district moradabad (mla-nidhi work)
Construction work of 125.00 m cc road and drain from the house of lokendra singh to the house of satpal singh in the village nidhi, block-chhajalat in district moradabad (mla-nidhi work)
Read moreConstruction work of 261.00 m cc road and drain from amroha kanth road to rajveer singh house in village abi hafizpur block chhajalat in district moradabad (mla-nidhi work)
Construction work of 261.00 m cc road and drain from amroha kanth road to rajveer singh house in village abi hafizpur block chhajalat in district moradabad (mla-nidhi work)
Read moreof your Industry type