Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Resin Bonded Fibre Glass Wool Insulation Laminated On One Side With Single Side Laminated Heat Resistant Aluminium Foil
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106582341 |
Reference Number |
52255089 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106591790/viewNitPdf_4849705.pdf |
Start Date | January 29, 2025 17:18 |
End Date |
21/02/2025 ( Expired 58 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual rate contract for execution of insulation with fixing of new aluminium sheets in various steam lines, equipments at different sections of amm-iii plant for a period of one year
Annual rate contract for execution of insulation with fixing of new aluminium sheets in various steam lines, equipments at different sections of amm-iii plant for a period of one year
Read moreSupply of alu-zinc sheet with one side protective lamination, make: tata/sail/jindal/any reputed,te
Read more
Supply of door swing operator with articulated arm for single doors and one side of the double door
Read more
Piping,painting, insulation,ndt, chemical cleaning, electrical,instrumentation, misc.civil and structural works, etc.including supply of materials (pkg-ii)on sub-contract basis in connection with composite works for pdh unit for gail usar pdh-project
Piping,painting, insulation,ndt, chemical cleaning, electrical,instrumentation, misc.civil and structural works, etc.including supply of materials (pkg-ii)on sub-contract basis in connection with composite works for pdh unit for gail usar pdh-project
Read moreSupply,erection,testing and commissioning of following works in adilabad (erstwhile) district on turnkey basis. lot-i: 132/33kv substation tallapet (ii) 132kv dc line (13km) for making lilo of 132kv dharmapuri-luxettipet to 132/33kv ss tallapet. lot-ii: 220kv dc line (3.145km) for making lilo of one circuit of 220kv jagityal-nirmal line to 400kv ss nirmal. lot-iii: (i) making lilo of 132kv pochampadu-nirmal with 2nd circuit stringing (33km) to 132kv ss burugupally and connected bay.
Supply,erection,testing and commissioning of following works in adilabad (erstwhile) district on turnkey basis. lot-i: 132/33kv substation tallapet (ii) 132kv dc line (13km) for making lilo of 132kv dharmapuri-luxettipet to 132/33kv ss tallapet. lot-ii: 220kv dc line (3.145km) for making lilo of one circuit of 220kv jagityal-nirmal line to 400kv ss nirmal. lot-iii: (i) making lilo of 132kv pochampadu-nirmal with 2nd circuit stringing (33km) to 132kv ss burugupally and connected bay.
Read moreWorks of replacement of old pump machinery at rwss parsoli block barisadri distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Works of replacement of old pump machinery at rwss parsoli block barisadri distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Read moreWorks of replacement of damaged pipeline and old pump machinery at rwss bohera block barisadri distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Works of replacement of damaged pipeline and old pump machinery at rwss bohera block barisadri distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Read moreWorks of replacement of damaged and worm pipeline at jjy doriya block nimbahera distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Works of replacement of damaged and worm pipeline at jjy doriya block nimbahera distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Read moreWorks of replacement of damaged adn worm pipeline at jjy jawda block nimbahera distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Works of replacement of damaged adn worm pipeline at jjy jawda block nimbahera distt. chittorgarh work including on single point responsibility basis with one year defect liability period.
Read moreof your Industry type