Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbpwd/Aebsd/Niet 10/2025 26/3
|
| Description |
Repair Of Footpath And Allied Works In Between Ch 13 705 Km To Ch 14 205 Km In Stretches On Diamond Harbour Road Eastern Side During The Year 2025 2026
|
| Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
| Tender Id | 2025_WBPWD_906524_5 |
|
Reference Number |
WBPWD/AEBSD/NIET-10/2025-26 |
| Tender Fee | 0 |
| EMD | 9888 |
| Tender Value | - |
| Place | ALIPORE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2061033 |
| Start Date | September 24, 2025 15:00 |
| End Date |
Expired
10/10/2025
Expired 372 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
S/r to baramile-kujidihi road such as repair of pot holes and long stretches with wmm, b.m and s.d.b.c from ch. 0/000 km to 3/270 km in the district of mayurbhanj for the year 2026-27.
S/r to baramile-kujidihi road such as repair of pot holes and long stretches with wmm, b.m and s.d.b.c from ch. 0/000 km to 3/270 km in the district of mayurbhanj for the year 2026-27.
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreEngineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line (ghaziabad-new moradabad) adjacent to the existing broad gauge (bg) electrified double line including detour portions with civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between ghaziabad (gzb)(ch: 145.710km)(excluding) to new moradabad (nmb)(excluding) (ch:0.850km) as per appr
Engineering, procurement and construction (epc) agreement for construction of 3rd and 4th railway line (ghaziabad-new moradabad) adjacent to the existing broad gauge (bg) electrified double line including detour portions with civil engineering works, track works, signalling & telecommunication works, over head electrification, electrical general services & all other allied works between ghaziabad (gzb)(ch: 145.710km)(excluding) to new moradabad (nmb)(excluding) (ch:0.850km) as per appr
Read moreConstruction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Read moreTraffic safety measures at nh-66- construction of drain, footpath and allied works between aralumoodu( ch 582/200) to inchivila(ch 598/400)
Traffic safety measures at nh-66- construction of drain, footpath and allied works between aralumoodu( ch 582/200) to inchivila(ch 598/400)
Read moreInterim measures to the damaged stretches of already d work in the downstream of farakka barrage on the right bank of river ganga between ch 4500 m to ch 4700 m r3 and between ch 4800 m to ch 4960 m r4
As per tender document
Read moreDressing of garden and allied works ( between gm bungalow and party office and garden at backside of the area)
Dressing of garden and allied works ( between gm bungalow and party office and garden at backside of the area)
Read moreGeneral road safety work providing footpath cum drain in kp road between ch 27/050-32/000 work general civil work
General road safety work providing&#x0d footpath cum drain in kp road between&#x0d ch 27/050-32/000 work general civil work
Read moreImprovement of the baghabazar sherkhan road from ch. 13.35 km to 15.40 km (2.05 km) (between natacherra police checkpoint and saiphai)
Improvement of the baghabazar sherkhan road from ch. 13.35 km to 15.40 km (2.05 km) (between natacherra police checkpoint and saiphai)
Read moreUrgent construction of unlined surface drain in stretches along the 1200mm dia conveying main service road between ch.24615m to ch.35715m from zoriwado to mugrupoe under 160mld salaulim water supply scheme. l5
Urgent construction of unlined surface drain in stretches along the 1200mm dia conveying main service road between ch.24615m to ch.35715m from zoriwado to mugrupoe under 160mld salaulim water supply scheme.
Read moreof your Industry type