Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Drainage Facilities On Naduvannur Mandankav Urallur Muthambi Road Between Ch 0 000 And 0 500 General Civil Work General Civil Work
|
| Description |
Providing Drainage Facilities On Naduvannur Mandankav Urallur Muthambi Road Between Ch 0 000 And 0 500 General Civil Work General Civil Work
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_687613_1 |
|
Reference Number |
D4/TN/40/2024-25 |
| Tender Fee | 2760 |
| EMD | 48090 |
| Tender Value | |
| Place | Naduvannur Mandankav Urallur Muthamb |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1076606 |
| Start Date | September 18, 2024 21:00 |
| End Date |
Expired
25/09/2024
Expired 645 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreRemaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Remaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Read moreGeneral-sainik school kazhakoottam - resurfacing the internal road from entrance gate 2 towards substation and towards junction near ground.-mace-general civil work
General-sainik school kazhakoottam -&#x0d resurfacing the internal road from entrance&#x0d gate 2 towards substation and towards&#x0d junction near ground.-mace-general civil&#x0d work
Read moreGeneral budget work 2025 26 construction of womens s friendly rest centre at various places in kayamkulam constituency waiting room and dormitory general civil work 1 re tender
General budget work 2025 26 construction of womens s friendly rest centre at various places in kayamkulam constituency waiting room and dormitory general civil work 1 re tender
Read moreMp-lads-construction of ayanikkad- villoonikkunn road, division 38-mp-lads sri et muhammed basheer construction of ayanikkad- villoonikkunn road, division 38 - general civil work
Mp-lads-construction of ayanikkad- villoonikkunn road, division 38-mp-lads sri et muhammed basheer construction of ayanikkad- villoonikkunn road, division 38 - general civil work
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreSupply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreGeneral maintenance contract in percentage rate contract on mes ssr 2020 for toilet maintenance works, including masonry, joinery, concrete work, painting, plumbing sanitary, fabrication, roof/roof members and connected works inside factory at ofk.
General maintenance contract in percentage rate contract on mes ssr 2020 for toilet maintenance works, including masonry, joinery, concrete work, painting, plumbing sanitary, fabrication, roof/roof members and connected works inside factory at ofk.
Read moreof your Industry type