Tender Details
Particulars | Details |
---|---|
Title |
1. Provision Of Ballastless Track For Station Development At Muri In 3 Nos. Pf Line.
2. Provision Of Ballastless Track For Station Development At Ranchi In 6 Nos. Pf Line No. 1, 1 A, 2, 3, 4 &Amp 5.
3. Provision Of Ballastless Track For Station Development At Hatia Station In 5 Nos. Pf Line (Including 4 &Amp 5 Under Construction Phase Ii
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72606215 |
Reference Number |
TRD-RNC-23-24-29 |
Tender Fee | 0 |
EMD | 20300 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72606215/viewNitPdf_4427449.pdf |
Start Date | December 16, 2023 00:01 |
End Date |
08/01/2024 ( Expired 502 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.
Construction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.&#x0d &#x0d
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreInternal improvement works of section no. s-413 (package-15) for water supply scheme 1. roop nagar 2. bareka 3. daulatpura 4. khippan wali , block khuian sarwar, distt. fazilka (under nabard xxvii/jjm)
5 no. repair of old ohsr (45, 50 and 100 cum ) , 2 no. repair of old pump chamber 6.10m x 4.88m , distribution system, providing and fixing of new household connection and repair of existing household connection complete in all respect and all other
Read moreUpgradation of roads in sector b-1, c-3, b- 5 and 6, c-9 residential and sector c-4 commercial at i.a. tds city ghaziabad
Upgradation of roads in sector b-1, c-3, b- 5 and 6, c-9 residential and sector c-4 commercial at i.a. tds city ghaziabad
Read moreProvision of pcc hard standing at cross lane 4-5, provision of stair case for emergency exist for qc department, 43 bldg and demolition of building nos. p 50b and p 59 (portion of rtc bldg) at naval dockyard, visakhapatnam under ge (i) dm, visakhapat
Provision of pcc hard standing at cross lane 4-5, provision of stair case for emergency exist for qc department, 43 bldg and demolition of building nos. p 50b and p 59 (portion of rtc bldg) at naval dockyard, visakhapatnam under ge (i) dm, visakhapat
Read moreConstruction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Construction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreAnnual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Annual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Read moreConst. of metaled road and 20mm thick pc in adarsh nagar street no. 11,16/4, 16/5, 1/6/1, 1/6/2 and 1/6 main zone 6 ward no. 1
Const. of metaled road and 20mm thick pc in adarsh nagar street no. 11,16/4, 16/5, 1/6/1, 1/6/2 and 1/6 main zone 6 ward no. 1
Read moreof your Industry type