Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Soil Exploration And Investigation At Site For Proposed Construction Of Two Pump Fire Station At Itahar Under Uttar Dinajpur Division, Pwd In The District Of Uttar Dinajpur.
|
| Description |
Soil Exploration And Investigation At Site For Proposed Construction Of Two Pump Fire Station At Itahar Under Uttar Dinajpur Division, Pwd In The District Of Uttar Dinajpur.
|
| Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
| Tender Id | 2025_WBPWD_834357_1 |
|
Reference Number |
WBPWD/EE/UDD/NIT-01/2025-26 |
| Tender Fee | 0 |
| EMD | 5550 |
| Tender Value | |
| Place | ITAHAR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1859176 |
| Start Date | April 11, 2025 16:30 |
| End Date |
Expired
18/04/2025
Expired 442 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing and modification of gaseous chlorination arrangement at wtp of sub surface water based piped water supply scheme at tapan western sector in the district of dakshin dinajpur under malda mechanical division p.h.e.dte.
Read moreS/r for sde residence and road and parking in the campus of pwd (bandr) colony at f. p. jhirka in nuh district
Sr for sde residence and road and parking in the campus of pwd(bandr) colony at f. p. jhirka in nuh district.
Read moreA/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
Read moreRepairs/ replacement of water supply pump, control valves and connected items of wellington station under ge wellington
Repairs/ replacement of water supply pump, control valves and connected items of wellington station under ge wellington
Read moreConstruction of various new bt roads in pwd dn kherwara and district udaipur package no. dmft-gc 11/kherwara/2025-26/kh/03
Construction of various new bt roads in pwd dn kherwara and district udaipur package no. dmft-gc 11/kherwara/2025-26/kh/03
Read moreSite development for garden banquet hall and construction of washroom facility at vrindavan vatika at north campus of iit mandi
Site development for garden banquet hall and construction of washroom facility at vrindavan vatika at north campus of iit mandi
Read moreConstruction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Construction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Read moreEngagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.
Engagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.
Read moreFixation of rate contract for supply of key construction material for various works of rural development and panchayati r district reasi aj under mgnrega in pyt sanger block-pouni district reasi
Fixation of rate contract for supply of key construction material for various works of rural development and panchayati r district reasi aj under mgnrega in pyt sanger block-pouni district reasi
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type