Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Comprehensive Operation And Maintenance Of 15 Mld Ttp At Jakkur To Supply Of Tertiary Treated Water To Yelahanka Combined Cycle Power Plant (Yccpp) Of Kpcl For A Period Of 5 Years
|
| Description |
Work Of Comprehensive Operation And Maintenance Of 15 Mld Ttp At Jakkur To Supply Of Tertiary Treated Water To Yelahanka Combined Cycle Power Plant (Yccpp) Of Kpcl For A Period Of 5 Years
|
| Organisation | Bengaluru Water Supply And Sewerage Board |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | Karnataka |
| Link | Login to view |
| Start Date | October 15, 2026 22:51 |
| End Date |
Open
16/11/2026
30 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dbo tender for tertiary treatment of sewage for industrial reuse at taloja midc. milestone 1 (phase 1) comprising of 50 mld kalamboli stp refurbishment with additional works, 20 mld tertiary treatment plant, 20 mld tertiary treated sewage pumping
Dbo tender for tertiary treatment of sewage for industrial reuse at taloja midc. milestone-1 (phase-1) comprising of 50 mld kalamboli stp refurbishment with additional works, 20 mld tertiary treatment plant, 20 mld tertiary treated sewage pumping
Read moreConstruction of 5 mld tertiary treatment plant (ttp) and allied infrastructrue at bandar road near existing 15 mld stp under panvel municipal corporation area
As per tender
Read moreUpgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated
Upgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated ef
Read morePreparation of detailed project report dpr and preparation of tender document for tertiary treatment plant of about 50 mld and its allied work related to reuse of treated water in thane municipal corporation area
Preparation of detailed project report dpr and preparation of tender document for tertiary treatment plant of about 50 mld and its allied work related to reuse of treated water in thane municipal corporation area
Read moreInvestigation and survey (on gis basis) of the project area including soil investigation, engineering design (hydraulic and structural) as required, procurement of all labour n material, tnp etc. and construction of 15 mld ttp for reuse treated water
Investigation and survey (on gis basis) of the project area including soil investigation, engineering design (hydraulic and structural) as required, procurement of all labour n material, tnp etc. and construction of 15 mld ttp for reuse treated water
Read moreInvestigation and survey (on gis basis) of the project area including soil investigation, engineering design (hydraulic and structural) as required, procurement of all labour n material, tnp etc. and construction of 15 mld ttp for reuse treated water
Investigation and survey (on gis basis) of the project area including soil investigation, engineering design (hydraulic and structural) as required, procurement of all labour n material, tnp etc. and construction of 15 mld ttp for reuse treated water
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Read moreof your Industry type