Tender Details

Particulars Details
Title
Design, Construction, Supply, Erection, Testing And Commissioning Of Tertiary Treatment By Sand And Carbon Filter System For 2 Mld Capacity Stp At Patto Including Comprehensive O And M For 3 Years
Description
Design, Construction, Supply, Erection, Testing And Commissioning Of Tertiary Treatment By Sand And Carbon Filter System For 2 Mld Capacity Stp At Patto Including Comprehensive O And M For 3 Years
Organisation SEWERAGE AND INFRASTRUCTURAL DEVELOPMENT CORPORATION OF GOA LTD | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 26000
EMD 5.88 Lakh
Tender Value
Place SIDCGL Panaji
Link

AAAAAAAAAA

Login to view
Start Date July 04, 2025 14:30
End Date

18/07/2025 ( 13 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and

Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines

Read more
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl

Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl

Read more
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Read more
Rate contract for supply, erection, testing and commissioning of 11kv ct/pt combined metering unit alongwith trivector meter and 3 phase 4 wire prodigy meter at various distribution transformers under electric division-i parade jammu

Rate contract for supply, erection, testing and commissioning of 11kv ct/pt combined metering unit alongwith trivector meter and 3 phase 4 wire prodigy meter at various distribution transformers under electric division-i parade jammu

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Canal water based water supply project for construction of 1.50 mld water treatment plant and other related works including operationa and maintenance for a period of 5 years (part-2) at fatehgarh panjtur town, distt. moga, punjab under amrut 2.0

Canal water based water supply project for construction of 1.50 mld water treatment plant and other related works including operationa and maintenance for a period of 5 years (part-2) at fatehgarh panjtur town, distt. moga, punjab under amrut 2.0

Read more
Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar

Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar

Read more
Design supply erection and commissioning of automatic fire detection and quenching system with bypass circuit at ground floor for conveyor 11a and 11b at bunker top 1 set

Design supply erection and commissioning of automatic fire detection and quenching system with bypass circuit at ground floor for conveyor 11a and 11b at bunker top 1 set

Read more
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years

Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise