Tender Details
Particulars | Details |
---|---|
Title |
Dismantling And Shifting Of Old Pump Motor Panels Capacitor Including All Foundation And Other Associated Equipment From Pump No. 11 To 20 Dalmau Pump Canal A Ist Stage
|
Description |
Dismantling And Shifting Of Old Pump Motor Panels Capacitor Including All Foundation And Other Associated Equipment From Pump No. 11 To 20 Dalmau Pump Canal A Ist Stage
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id | 2024_UPIDM_982602_1 |
Reference Number |
SHORT TERM E-TENDER NOTICE No. 23/ E.E. /S.S.K.-6/2024-25 |
Tender Fee | 766 |
EMD | 28000 |
Tender Value | |
Place | DALMAU RAEBARELI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1729725 |
Start Date | December 12, 2024 15:30 |
End Date |
02/01/2025 ( Expired 140 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Inviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item
Inviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item
Read morePump shifting, pipeline shifting, change of damage pipe, dismantling and carrying pump-motor from surface to sump and placement on pontoon, and other safety jobs on urgent basis at water body associated with nearby zone at dlb-iii, pandaveswar area
Pump shifting, pipeline shifting, change of damage pipe, dismantling and carrying pump-motor from surface to sump and placement on pontoon, and other safety jobs on urgent basis at water body associated with nearby zone at dlb-iii, pandaveswar area
Read moreProviding, laying and installation of maintenance free new earthing g.i. strip for all ht equipment 11 kv and l.t. equipment 0.415 kv at dalmau a pump canal modernization project, ist stage dalmau, raebareli
Providing, laying and installation of maintenance free new earthing g.i. strip for all ht equipment 11 kv and l.t. equipment 0.415 kv at dalmau a pump canal modernization project, ist stage dalmau, raebareli
Read moreRestoration of l.i. scheme at nalicherra vp under uttar nalicherra gp during the year 2025 26 sh shifting of pump house and installation of pump motor electrical equipments and all other accessories.
Restoration of l.i. scheme at nalicherra vp under uttar nalicherra gp during the year 2025 26 sh shifting of pump house and installation of pump motor electrical equipments and all other accessories.
Read moreFirst class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410)km of pastaur pump canal, raibareli including all cost of material
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreRepair and shifting of 11 kv trivector energy meter from old ht 11 kv vcb panel to newly installed 11 kv vcb, servicing and repairing of 11 kv vcb panels alongwith connected items at khyber grid under aor of age (sldc) e/s under ge (u) elect supply
Repair and shifting of 11 kv trivector energy meter from old ht 11 kv vcb panel to newly installed 11 kv vcb, servicing and repairing of 11 kv vcb panels alongwith connected items at khyber grid under aor of age (sldc) e/s under ge (u) elect supply
Read moreMaintenance of road from nh08 (bsf 1 no gate) to nehal chandra nagar animal husbandry office via central jail and nc nagar bazar (l_3point50 km) during the year 2025_26
Sh_flat brick soling, edge soling, repairing of pot holes, recarpeting, seal coat on old bituminous surface and other ancillary works etc (portion from ch 1point30 km to ch 3point50 km)
Read more1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli
Read more1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
Read moreConstruction of cc road from bharatpur road to nagar palika office mahwa.
Construction of cc road from bharatpur road to nagar palika office mahwa.
Read moreof your Industry type