Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Increasing Sleeper Density On Gadag Hotgi Section 📊 The Ministry Of Railways, Central Government, Invites Bids For The Project Aimed At Increasing Sleeper Density On The Gadag Hotgi Section, Hubballi Division, For A Track Length Of 6.221 Tkm On A Loop Line. 📅 Bid Submission Deadline: April 8, 2024, 11:00 Am The Tender Fee Is Inr 0, With An Earnest Money Deposit (Emd) Of Inr 118,800. Interested Bidders Should Refer To The Tender Document For Complete Details And Submission Guidelines. Keywords: Ministry Of Railways, Gadag Hotgi Section, Sleeper Density, Hubballi Division, Infrastructure Project, Government Tender, Emd, Tender Submission| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Gadag Hotgi Section: Increasing Sleeper Density For Length Of 6.221 Tkm In Loop Line.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73592246 |
|
Reference Number |
57UBL23-24DT120324ITEM-03 |
| Tender Fee | 0 |
| EMD | 1.19 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73592246/viewNitPdf_4481025.pdf |
| Start Date | March 13, 2024 16:18 |
| End Date |
Expired
08/04/2024
Expired 923 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Samdari -barmer increasing sleeper density - 128.104 t km.
Samdari -barmer increasing sleeper density - 128.104 t km.
Read moreComplete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Read moreOpen e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Read moreVelcro tapes ( loop) of size width 25 mm and length 25 mtr.
Velcro tapes ( loop) of size width 25 mm and length 25 mtr.
Read moreThrough sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Read moreLotapahar - loop line for 3rd line at lotapahar and one sick siding of 70 m length
Lotapahar - loop line for 3rd line at lotapahar and one sick siding of 70 m length
Read moreExecution of signaling & telecommunication work in connection with: (1) raipur division - ttr (tws+wcmsc)-18 sets (main line) & 34 sets (loop line), ttr (wcmsc) -38 sets & ttr (ds)-8 sets, (2) bilaspur-durg: trr(p)-31.723 tkm.
Execution of signaling & telecommunication work in connection with: (1) raipur division - ttr (tws+wcmsc)-18 sets (main line) & 34 sets (loop line), ttr (wcmsc) -38 sets & ttr (ds)-8 sets, (2) bilaspur-durg: trr(p)-31.723 tkm.
Read moreI).rangiya jn.-north lakhimpur- tfr on loop lines- 39.556 tkm.(project id:08.04.31.26.3.53.009. ii)yard improvement- rangiya jn.-rangapara north -ttr(fs+tws+wcms)- 6 sets(1:12)& ttr(tws+wcms)-28 sets(1:12)(project id:08.04.31.26.3.53.008)
I).rangiya jn.-north lakhimpur- tfr on loop lines- 39.556 tkm.(project id:08.04.31.26.3.53.009. ii)yard improvement- rangiya jn.-rangapara north -ttr(fs+tws+wcms)- 6 sets(1:12)& ttr(tws+wcms)-28 sets(1:12)(project id:08.04.31.26.3.53.008)
Read moreS&t work for construction of loop line to 3rd line and one sick siding of 70 m length and proper pathway in station yards at sonua.
S&t work for construction of loop line to 3rd line and one sick siding of 70 m length and proper pathway in station yards at sonua.
Read moreOhe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Read moreof your Industry type