Tender Details
About Tender
🚂 Invitation For Bids: Trivandrum Division Sleeper Density Enhancement 🛣️🚆 The Ministry Of Railways, Central Government, Invites Bids For The Project "Increasing Sleeper Density (S)" On The Trivandrum Division, Specifically For The Srr Ers Section (1.946 Km) And The Ers Ktym Kyj Section (4.685 Km), Totaling 6.631 Tkm. 📅 Bid Submission Deadline: May 09, 2024, 11:00 Am A Tender Fee Of Inr 99,600 Is Applicable For The Earnest Money Deposit (Emd). Interested Bidders Should Review The Complete Tender Document For Detailed Project Requirements And Submission Guidelines. Keywords: Trivandrum Division, Sleeper Density, Railway Project, Ministry Of Railways, Central Government, Infrastructure Development, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Trivandrum Division Increasing Sleeper Density (S) For A Length Of 6.631 Tkm (Srr Ers Section 1.946 Km, Ers Ktym Kyj Section 4.685 Km)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74544955 |
Reference Number |
11-TVC-6-2024 |
Tender Fee | 0 |
EMD | 99600 |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74544955/viewNitPdf_4532510.pdf |
Start Date | April 16, 2024 23:02 |
End Date |
09/05/2024 ( Expired 375 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreIndependent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreRoutine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Routine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Read moreShort term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read moreIndependent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreUpgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Upgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Read moreGeneral-rm rc 2 phase 1/2024-25/one year rc- zone iv-for various pwd roads under roads section-thodupuzha in idukki district-3 road stretches for a length of 16.39 km
General-rm rc 2 phase 1/2024-25/one&#x0d year rc- zone iv-for various pwd roads&#x0d under roads section-thodupuzha in idukki&#x0d district-3 road stretches for a length of 16.39&#x0d km
Read moreof your Industry type