Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Remaining Works In Jakhaura Bijrautha Group Of Villages Water Supply Scheme Including Supply Of All Materials Labour Tn P Complete In All Respect On Turn Key Basis After Completion Commissioning And Completion Of Trial Run With Defect Liability
|
| Description |
Remaining Works In Jakhaura Bijrautha Group Of Villages Water Supply Scheme Including Supply Of All Materials Labour Tn P Complete In All Respect On Turn Key Basis After Completion Commissioning And Completion Of Trial Run With Defect Liability
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPJNG_817466_1 |
|
Reference Number |
396/NIvida/84 Date 01-07-2023 |
| Tender Fee | 11800 |
| EMD | 4 Lakh |
| Tender Value | - |
| Place | Circle Office, UP Jal Nigam Rural Jhansi |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | July 03, 2023 17:45 |
| End Date |
Expired
11/07/2023
Expired 1191 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreRemaining works in jakhora bijroutha gov water supply scheme including supply of all materials labours tnp complete in all respect on turn key basis after completion commissioning and completion of trail run with defect liability period of works
Remaining works in jakhora bijroutha gov water supply scheme including supply of all materials labours tnp complete in all respect on turn key basis after completion commissioning and completion of trail run with defect liability period of works
Read moreRemaining works of umarpur water supply scheme including supply of all materials, labour t and p etc complete in all respect required for successful completion, commissioning and completion and trial and run.
Remaining works of umarpur water supply scheme including supply of all materials, labour t and p etc complete in all respect required for successful completion, commissioning and completion and trial and run.
Read moreRepair, retrofitting, operation and maintenance of rural water supply schemes with 3 months trial run after commissioning and comprehensive operation and maintenance of 120 months after successful completion of trial run period under jjm, up
Repair, retrofitting, operation and maintenance of rural water supply schemes with 3 months trial run after commissioning and comprehensive operation and maintenance of 120 months after successful completion of trial run period under jjm, up
Read moreSupply, installation, trial run, training and commissioning of electrically operated (motorized) bogie turn table, cap. 10 ton as per specification enclosed.
For complete deion and other details, please refer to tender
Read moreSupply, installation, trial run, training and commissioning of wheel turn table with motorized hydraulic power pack with jacks for wheelturning cap 03 t
For complete deion and other details, please refer to tender
Read moreSupply, installation, trial run, training and commissioning of wheel turn table with motorized hydraulic power pack with jacks for wheelturning cap 03 t
For complete deion and other details, please refer to tender
Read moreInstallation works of 6 nos handpump india mark ii including survey design supply of all materials labour t and p complete in all respect on turn key basis after complete commissioning and completion of trail and run with operation and maintenance
Installation works of 6 nos handpump india mark ii including survey design supply of all materials labour t and p complete in all respect on turn key basis after complete commissioning and completion of trail and run with operation and maintenance
Read moreDesign, engineering, manufacturing, testing, inspection, supply, delivery and supervision of erection /installation, trial run and commissioning of high mast lighting system complete in all respect for our nrl-iavl coit project
Design, engineering, manufacturing, testing, inspection, supply, delivery and supervision of erection /installation, trial run and commissioning of high mast lighting system complete in all respect for our nrl-iavl coit project
Read morePlanning, design, engineering, construction, fabrication, supply, erection, trial run and commissioning of 2x4 mva, 33kv/3.3kv substation including operation and maintenance during defect liability period on turnkey basis at shiwani ug mine
Planning, design, engineering, construction, fabrication, supply, erection, trial run and commissioning of 2x4 mva, 33kv/3.3kv substation including operation and maintenance during defect liability period on turnkey basis at shiwani ug mine
Read moreof your Industry type