Tender Details

Particulars Details
Title
Design Engineering And Procurement Of Construction Of 500 Bedded 08 Storey Multistorey Building And Patient Utility Complex For Expansion Of Trauma Center In King Georges Medical University Lucknow Up On Epc Mode
Description
Design Engineering And Procurement Of Construction Of 500 Bedded 08 Storey Multistorey Building And Patient Utility Complex For Expansion Of Trauma Center In King Georges Medical University Lucknow Up On Epc Mode
Organisation Planning Department UP | State Govt. and UT
Tender Id 2025_DPUP_1014187_1
Reference
Number
108(SE)/General/Technical Cell/2025 dated 27.02.2025
Tender Fee 41654
EMD 50 Lakh
Tender Value
Place Lucknow
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1825359
Start Date March 17, 2025 16:30
End Date

25/03/2025 ( Expired 27 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode

Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.

Read more
Rectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode

Rectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode

Read more
Planning, engineering, installation, testing and commissioning of vertical lift and connecting bridges complete in all respect between peerkho to mubarak mandi complex, on engineering, procurement and construction (epc) mode.

Planning, engineering, installation, testing and commissioning of vertical lift and connecting bridges complete in all respect between peerkho to mubarak mandi complex, on engineering, procurement and construction (epc) mode.

Read more
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period

Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode

Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode

Read more
Design engineering and procurement of construction of 200 bedded district hospital at district sitapur uttar pradesh on epc mode

Design engineering and procurement of construction of 200 bedded district hospital at district sitapur uttar pradesh on epc mode

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Rehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.

Rehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.

Read more
Design engineering and procurement of construction of international exhibition cum convention centre for 10000 people in avadh vihar yojna district lucknow up on epc mode

Design engineering and procurement of construction of international exhibition cum convention centre for 10000 people in avadh vihar yojna district lucknow up on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise