Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Work Of 6.6 Kv Overhead Line/ Feeders Supplying Power To 10/42 Cum Shovel /Drills, Weighbridges, Pumps And Lighting Transformers At Quarry Of Dipka Expansion Project.
|
| Description |
Maintenance Work Of 6.6 Kv Overhead Line/ Feeders Supplying Power To 10/42 Cum Shovel /Drills, Weighbridges, Pumps And Lighting Transformers At Quarry Of Dipka Expansion Project.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_319321_1 |
|
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/24-25/52 dtd-17/10/24 |
| Tender Fee | 0 |
| EMD | 25200 |
| Tender Value | |
| Place | Dipka Expansion Project, Dipka Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331003 |
| Start Date | October 19, 2024 15:30 |
| End Date |
Expired
30/10/2024
Expired 594 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Di and shifting of 6.6 kv ht overhead line feeder no. 60 at kcc chowk for supplying power to old dipka sump at dipka expansion project.
Di and shifting of 6.6 kv ht overhead line feeder no. 60 at kcc chowk for supplying power to old dipka sump at dipka expansion project.
Read moreMajor dismantling work of old and unused 6.6 kv ht and lt overhead lines of feeder located in quarry of dipka expansion project.
Major dismantling work of old and unused 6.6 kv ht and lt overhead lines of feeder located in quarry of dipka expansion project.
Read moreErection of 6.6 kv ht overhead line feeder no. 38, 39 and 40 from 33 kv/6.6 kv renki substation to suwabhondi patch at dipka expansion project.
Erection of 6.6 kv ht overhead line feeder no. 38, 39 and 40 from 33 kv/6.6 kv renki substation to suwabhondi patch at dipka expansion project.
Read moreMajor dismantling, di and relocation work of 6.6 kv overhead line feeder nos. 52, 53 and 54 at dipka expansion project
Major dismantling, di and relocation work of 6.6 kv overhead line feeder nos. 52, 53 and 54 at dipka expansion project
Read morePre monsoon maintenance of 6.6 kv tetulmari overhead feeders
For pre monsoon maintenance of 6.6 kv tetulmari overhead feeders originating from sbrs to tetulmari 7/8 substation with mudidih colliery as branch line as per preventive monsoon preparation 2023,under sijua
Read moreErection of 6.6 kv feeder line emanating from 33 kv/6.6 kv substation and supplying power to last active area of projects quarry as new additional feeder.
Erection of 6.6 kv feeder line emanating from 33 kv/6.6 kv substation and supplying power to last active area of projects quarry as new additional feeder.
Read morePre-monsoon maintenance of 6.6 kv basdeopur overhead feeders originating
For pre-monsoon maintenance of 6.6 kv basdeopur overhead feeders originating from sbrs to basdeopur colliery with ocp mine mine substation as branch line as per preventive monsoon preparation 2023.
Read morePre-monsoon maintenance of ht / lt overhead line including lighting line under surface power supply section of dipka expansion project (approximate route length - 11 km).
Pre-monsoon maintenance of ht / lt overhead line including lighting line under surface power supply section of dipka expansion project (approximate route length - 11 km).
Read moreWork of rectification of overhead line and minor maintenance of 6.6 kv / 3.3 kv / lighting line in case of a breakdown in all three shifts at the quarry of the gevra project for 365 days.
Work of rectification of overhead line and minor maintenance of 6.6 kv / 3.3 kv / lighting line in case of a breakdown in all three shifts at the quarry of the gevra project for 365 days.
Read moreAssistance in rectification of h.t/l.t overhead line faults in back shifts at quarry of dipka expansion project for a period of one year.
Assistance in rectification of h.t/l.t overhead line faults in back shifts at quarry of dipka expansion project for a period of one year.
Read moreof your Industry type