| Particulars | Details |
|---|---|
| Title |
Erecting Of Energized Fencing With 4 Strand Using Wooden Post Of 6 7 Ft Height And 6 Inch Girth At 2.5 Mt Apart Fixing The Fence Posts After Digging Pits Of 30 Cm X 30 Cm X 40 Cm Depth And Consolidation Ensuring Firm Fixture Unrolling Over 20.23 H
|
| Description |
Erecting Of Energized Fencing With 4 Strand Using Wooden Post Of 6 7 Ft Height And 6 Inch Girth At 2.5 Mt Apart Fixing The Fence Posts After Digging Pits Of 30 Cm X 30 Cm X 40 Cm Depth And Consolidation Ensuring Firm Fixture Unrolling Over 20.23 H
|
| Organisation | DIRECTORATE OF FORESTS | State Govt. and UT |
| Tender Id | 2025_DOFR_893965_1 |
|
Reference Number |
WBFOR/KFD/NIT- 15/2025-26/SDP |
| Tender Fee | 0 |
| EMD | 4956 |
| Tender Value | - |
| Place | MONGPONG |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2016179 |
| Start Date | August 25, 2025 18:30 |
| End Date |
Expired
05/09/2025
Expired 405 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Read moreErecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 5.5 ha
Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 5.5 ha
Read moreErecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 7ha of
Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 7ha of
Read moreErecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 10.5 h
Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 10.5 h
Read moreMtrl and labour for felling of tree 30 cm girth,mtrl and labour for felling of tree 300 cm girth,mt
Read more
Supply and planting of flower beds including digging 30 cm deep bed and refilling of beds with excavated soil and fym and all other works contingent thereto under horticulture division hsvp gurugram
Supply and planting of flower beds including digging 30 cm deep bed and refilling of beds with excavated soil and fym and all other works contingent thereto under horticulture division hsvp gurugram
Read moreAnnual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii
Annual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii
Read moreClearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. a
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. a