Tender Details

Particulars Details
Title
Erecting Of Energized Fencing With 4 Strand Using Wooden Post Of 6 7 Ft Height And 6 Inch Girth At 2.5 Mt Apart Fixing The Fence Posts After Digging Pits Of 30 Cm X 30 Cm X 40 Cm Depth And Consolidation Ensuring Firm Fixture Unrolling Over 7 Ha Of
Description
Erecting Of Energized Fencing With 4 Strand Using Wooden Post Of 6 7 Ft Height And 6 Inch Girth At 2.5 Mt Apart Fixing The Fence Posts After Digging Pits Of 30 Cm X 30 Cm X 40 Cm Depth And Consolidation Ensuring Firm Fixture Unrolling Over 7 Ha Of
Organisation DIRECTORATE OF FORESTS | State Govt. and UT
Tender Id 2025_DOFR_862763_1
Reference
Number
WBFOR/KFD/NIT- 11/2025-26/WBFBCCCR
Tender Fee 0
EMD 3444
Tender Value -
Place Pankhasari Range
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1963223

Start Date July 01, 2025 22:30
End Date
Expired 07/07/2025

Expired 466 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc

Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc

Read more
Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 5.5 ha

Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 5.5 ha

Read more
Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 10.5 h

Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 10.5 h

Read more
Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 20.23h

Erecting of energized fencing with 4 strand using wooden post of 6-7 ft height and 6 inch girth at 2.5 mt apart fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation ensuring firm fixture unrolling over 20.23h

Read more
Annual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii

Annual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii

Read more
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. a

Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. a

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise