Tender Details
Particulars | Details |
---|---|
Title |
Cash In Transit Service 2000; Driver Only; Not Applicable; Air Conditioned; 3; 2,Cash In Transit
|
Description |
|
Organisation | Department of Financial Services | Ministry of Finance |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 14, 2025 21:34 |
End Date |
04/06/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreProcurement of compressor assembly of air conditioning system of pc 2000-8 (k-1, k-2, k-3) of amlohri project
Procurement of compressor assembly of air conditioning system of pc 2000-8 (k-1, k-2, k-3) of amlohri project
Read moreConstruction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Construction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreCash in transit service - 2000; driver only; not applicable; air conditioned; 3; 2,cash in transit
Read more
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreDesign supply erection and commissioning of vfds in cep motors of unit 1 2 3
Design supply erection and commissioning of vfds in cep motors of unit-1 2 3
Read moreof your Industry type