Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Performance Based Contract Annual Repair Running And Maintenance Of Sewage Network Under Stp North Disposal Zone For Three Year (2023 24, 2024 25, 2025 26) Complete As Direction Of Er. In Charge
|
| Description |
Performance Based Contract Annual Repair Running And Maintenance Of Sewage Network Under Stp North Disposal Zone For Three Year (2023 24, 2024 25, 2025 26) Complete As Direction Of Er. In Charge
|
| Organisation | Government of Himachal Pradesh |
| Tender Id | 2023_MC_76068_1 |
|
Reference Number |
858-60 |
| Tender Fee | 5000 |
| EMD | 2.28 Lakh |
| Tender Value | - |
| Place | AGM SEWERAGE DIVISION SJPNL US CLUB SHIMLA |
| Link |
View Original Tender Notice
https://hptenders.gov.in |
| Start Date | July 11, 2023 22:30 |
| End Date |
Expired
22/07/2023
Expired 1184 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.
Construction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.
Read moreProviding inlet disposal network at 9.58 mld stp and levelling of site in venkatagiri municipality under swachh bharath mission (urban) 2.0
Providing inlet disposal network at 9.58 mld stp and levelling of site in venkatagiri municipality under swachh bharath mission (urban) 2.0
Read moreAnnual repair and operation and maintenance of sewerage treatment plant kunihar area in tehsil arki district solan hp sh deployment of labour_staff for operation running and maintenance of 0.90 mld capacity stp including sewerage network system to k
Sh deployment of labour_staff for operation running and maintenance of 0.90 mld capacity stp including sewerage network system to kunihar area for a period of 18 months
Read moreGrowler,set of rowel punch 8, 10 mm,autotransformer 250v, 0 to 300 v,10a,solid state solar based single phase energy meter, bidirectional, 5 to 30 amps, 240 volts,three phase kwh meter analog 25a, 415 v a. c,three phase kwh meter digital 25a, 415 v a. c,wiring board on stand 3 meter x 1 meter with 0.5 meter projection on the top,limit switch, liver operated 2a 500v, 2 contacts,cut out relays 16a, 440v,under voltage relay 360v to 440v,earth electrode primary electrode 2100x28x3.25mm,earth electrode secondary cu strip 20x5mm,bus bar with brackets 1 mtr each,solar panels 250 wp,solar panels 15 wp,solar charge controller with manual switch, day lighting 6v,5 a,dc power supply 250v dc, 25 amp,automatic reverse forward er,soft er 1 ph,field regulator 0 to 1000 ohmic, 2 amps,d.c. shunt motor 3 h.p 250 v with 3 point er and speed regulator, laboratory type,immersion heater 1500 watt, 240v,ac table fan 68 watt, 230 v,dmx controller,rewinding machine,demonstration table 2.5 x 1.25 x 0.75 m,blackboard wit
Growler,set of rowel punch 8, 10 mm,autotransformer 250v, 0 to 300 v,10a,solid state solar based single phase energy meter, bidirectional, 5 to 30 amps, 240 volts,three phase kwh meter analog 25a, 415 v a. c,three phase kwh meter digital 25a, 415 v a. c,wiring board on stand 3 meter x 1 meter with 0.5 meter projection on the top,limit switch, liver operated 2a 500v, 2 contacts,cut out relays 16a, 440v,under voltage relay 360v to 440v,earth electrode primary electrode 2100x28x3.25mm,earth electrode secondary cu strip 20x5mm,bus bar with brackets 1 mtr each,solar panels 250 wp,solar panels 15 wp,solar charge controller with manual switch, day lighting 6v,5 a,dc power supply 250v dc, 25 amp,automatic reverse forward er,soft er 1 ph,field regulator 0 to 1000 ohmic, 2 amps,d.c. shunt motor 3 h.p 250 v with 3 point er and speed regulator, laboratory type,immersion heater 1500 watt, 240v,ac table fan 68 watt, 230 v,dmx controller,rewinding machine,demonstration table 2.5 x 1.25 x 0.75 m,blackboard wit
Read morePerformance based contract annual repair running and maintenance of sewage network under stp summerhill zone, stp snowdone and stp dhalli for three year (2023-24, 2024-25, 2025-26) complete as direction of er.-in-charge
Performance based contract annual repair running and maintenance of sewage network under stp summerhill zone, stp snowdone and stp dhalli for three year (2023-24, 2024-25, 2025-26) complete as direction of er.-in-charge
Read morePerformance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years
Performance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years
Read morePerformance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years.
Performance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years.
Read morePerformance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years
Performance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years
Read morePerformance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years.
Performance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years.
Read morePerformance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years.
Performance based annual repair, running and maintenance of sewerage network of stp lalpani zone for two years.
Read moreof your Industry type