Tender Details

Particulars Details
Title
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Undewadi Fp At Km 18.585 Of Patas Baramati Section From Km 0.000 To Km. 41.369 Of Nh 965 G In Maharashtra
Description
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Undewadi Fp At Km 18.585 Of Patas Baramati Section From Km 0.000 To Km. 41.369 Of Nh 965 G In Maharashtra
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_216282_1
Reference
Number
NHAI/13013/547/CO/ 24-25/CB/Undewadi FP
Tender Fee 0
EMD 0
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=239418
Start Date November 25, 2024 23:30
End Date

09/12/2024 ( Expired 162 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis

Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Read more
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

Read more
Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Read more
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.

Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.

Read more
O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.

O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.

Read more
Consultancy services for supervision consultant for four laned rohtak to panipat section of nh-709 (old nh-71a) from km. 0.000 to km. 80.858 in the state of haryana d on dbfot mode (terminated).

Consultancy services for supervision consultant for four laned rohtak to panipat section of nh-709 (old nh-71a) from km. 0.000 to km. 80.858 in the state of haryana d on dbfot mode (terminated).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise