🏭 Procurement Opportunity: Flare Gas Recovery Compressor (Fgrc) System For Ongc Hazira 🛠️ Oil And Natural Gas Corporation Limited (Ongc), A Leading Public Sector Undertaking, Is Seeking Bids From Experienced Vendors For The Design, Supply, Installation, And Commissioning Of A Flare Gas Recovery Compressor (Fgrc) System At Its Hazira Plant In Surat. 📅 Bid Submission Deadline: June 3, 2024, 3:00 Pm A Tender Security Amount Of Inr 7,59,100 Has Been Set. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And Project Execution Timelines, To Meet The Stringent Requirements Of The Project. Keywords: Flare Gas Recovery Compressor, Fgrc System, Ongc, Hazira Plant, Surat, Public Sector Undertaking, Engineering Procurement Construction, Epc Tender, Bid Submission
Particulars Details
Title
Design, Supply, Installation And Commissioning Of Flare Gas Recovery Compressor (Fgrc) System At Ongc Hazira
Description
Design, Supply, Installation And Commissioning Of Flare Gas Recovery Compressor (Fgrc) System At Ongc Hazira
Organisation Oil and Natural Gas Corporation Limited | Public Sector Undertakings
Tender Id 2024_ONGC_192102_1
Reference
Number
ZV8VC24003
Tender Fee 0
EMD 75.91 Lakh
Tender Value -
Place ONGC HAZIRA PLANT, SURAT
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=210410

Start Date April 01, 2024 20:30
End Date
Expired 17/06/2024

Expired 802 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Read more
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)

Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.

Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.

Read more
Establishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.

Establishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.

Read more
Design, fabrication, supply, installation & commissioning of a museum-grade animated display prototype depicting the journey of electricity from power generation to end consumers through the bihar transmission & distribution network.

Design, fabrication, supply, installation & commissioning of a museum-grade animated display prototype depicting the journey of electricity from power generation to end consumers through the bihar transmission & distribution network.

Read more
Design, manufacture, supply, installation, testing and commissioning with five years comprehensive maintainance contract of on grid connected solar power plant (with net meter) at taldev tal mahabaleshwar dist. satara

Design, manufacture, supply, installation, testing and commissioning with five years comprehensive maintainance contract of on grid connected solar power plant (with net meter) at taldev tal mahabaleshwar dist. satara

Read more
Supply installation testing commissioning of flare management system in ongc uran plant

Supply installation testing commissioning of flare management system in ongc uran plant.

Read more