Tender Details
Particulars | Details |
---|---|
Title |
Ie Services For Operation And Maintenance Of 6 Lane Extra Dosed Cable Stayed Sister Nivedita Bridge Tollway Project Over River Hooghly Along With Its Approaches (On Old Nh 2) On Bot Toll Basis In The State Of West Bengal
|
Description |
Ie Services For Operation And Maintenance Of 6 Lane Extra Dosed Cable Stayed Sister Nivedita Bridge Tollway Project Over River Hooghly Along With Its Approaches (On Old Nh 2) On Bot Toll Basis In The State Of West Bengal
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_212453_1 |
Reference Number |
NHAI/RO-KOL/24-25/IE/SVBTC |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | Kolkata |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=233668 |
Start Date | October 24, 2024 22:10 |
End Date |
27/01/2025 ( Expired 83 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreIe services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly along with its approaches (on old nh-2) on bot toll basis in the state of west bengal
Ie services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly along with its approaches (on old nh-2) on bot toll basis in the state of west bengal
Read moreConsultancy services for authority engineer for supervision of construction of 6 lane h.l./extra-dosed cable bridge on river ganga parallel to western side of digha-sonepur rail-cum-road bridge at patna on ganga river on nh-139w in the state of bihar
Consultancy services for authority engineer for supervision of construction of 6 lane h.l./extra-dosed cable bridge on river ganga parallel to western side of digha-sonepur rail-cum-road bridge at patna on ganga river on nh-139w in the state of bihar
Read moreOperation maintenance of naini cable stayed bridge across yamuna river with approaches km minus 1.117 to km 4.293 at allahabad naini in up on nh 27 new nh30 in the state of uttar pradesh 2nd call
Operation maintenance of naini cable stayed bridge across yamuna river with approaches km minus 1.117 to km 4.293 at allahabad naini in up on nh 27 new nh30 in the state of uttar pradesh 2nd call
Read moreConstruction of h.l. bridge over satgudum river at bagudiya panchayat,narsinghpur tola,dumakocha in galudih on nh-18 to asanpani west bengal border road via duarsini at ghatshila block total length-885m for the year 2024-25
Construction of h.l. bridge over satgudum river at bagudiya panchayat,narsinghpur tola,dumakocha in galudih on nh-18 to asanpani west bengal border road via duarsini at ghatshila block total length-885m for the year 2024-25
Read moreShort term operation and maintenance of naini cable stayed bridge across yamuna river with approaches km minus 1.117 to km 4.293 on nh30 at allahabad naini in u.p.
Short term operation and maintenance of naini cable stayed bridge across yamuna river with approaches km minus 1.117 to km 4.293 on nh30 at allahabad naini in u.p.
Read moreIe services during operation and maintenance stage of 4 lane of jaipur deoli section of nh 52 from km. 18.700 to 165.000 (total length 148.770 km) in the state of rajasthan on dbfot (toll) mode
Ie services during operation and maintenance stage of 4 lane of jaipur deoli section of nh 52 from km. 18.700 to 165.000 (total length 148.770 km) in the state of rajasthan on dbfot (toll) mode
Read moreRe construction of 4 lane major bridge at km 173.600 across lakshmanathirtha river along with approaches from km 171.300 to 176.400 in hunsur town limits on nh 275 bantwal mysore section in the state of karnataka
Re construction of 4 lane major bridge at km 173.600 across lakshmanathirtha river along with approaches from km 171.300 to 176.400 in hunsur town limits on nh 275 bantwal mysore section in the state of karnataka
Read moreConsultancy services of authority engineer for construction of new major bridge over baghmati and lakhandei river along with approaches from design km. 16.500 to km. 21.500 on nh 527c in the state of bihar on epc mode
Consultancy services of authority engineer for construction of new major bridge over baghmati and lakhandei river along with approaches from design km. 16.500 to km. 21.500 on nh 527c in the state of bihar on epc mode
Read moreConstruction of new major bridge over baghmati and lakhandei river along with approaches from design km.16.500 to km.21.500 on nh-527c in the state of bihar on epc mode
Construction of new major bridge over baghmati and lakhandei river along with approaches from design km.16.500 to km.21.500 on nh-527c in the state of bihar on epc mode
Read moreof your Industry type