Tender Details
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission (Jjm) 2022 23 Cwss To 13 Panchayaths Based On Malankara Reservoir Meenachil Panchayath
|
Description |
1)supply Laying Of 300/250/200/150/100 Mm Di Transmission/Distribution Mains From Service Reservoirs(2)design And Constrcution Of Ohs Rs At Paalakkad,Kanjirathanam And Muthirappara(3)providing Distribution Networks And Fht Cs In Meenachil Panchayath Etc
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2024_KWA_643898_1 |
Reference Number |
1Re_WRD/KWA-CE(SR)/ TR/7902/2022_26_6_5/1 |
Tender Fee | 16540 |
EMD | 5 Lakh |
Tender Value | |
Place | Meenachil |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=984884 |
Start Date | January 12, 2024 23:30 |
End Date |
27/01/2024 ( Expired 478 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreOperation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Read moreMaintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25
Maintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25
Read moreJjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Jjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreJal jeevan mission (jjm)- vanniyamkulam
Jal jeevan mission (jjm)-&#x0d vanniyamkulam - additional-&#x0d work for har ghar jal&#x0d declaration(fhtc)-pipeline&#x0d work.
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreWater supply scheme of jal jeevan mission under dws sub-division ampi/s.h construction of 1(one) nos. semi permanent pump house of size (5.50mtr x 3.00 mtr) including providing and laying of distribution pipeline, extension of fhtc, supplying and ins
Water supply scheme of jal jeevan mission under dws sub-division ampi/s.h construction of 1(one) nos. semi permanent pump house of size (5.50mtr x 3.00 mtr) including providing and laying of distribution pipeline, extension of fhtc, supplying and ins
Read moreof your Industry type