Tender Details
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission (Jjm) 2022 23 Cwss To 13 Panchayaths Based On Malankara Reservoir Meenachil Panchayath
|
Description |
(1)supply And Laying Of 300 250200 150 100 Mm Di Transmission Distribution Mains From Service Reservoirs (2) Ohs Rs At Paalakkad, Kanjirathanam And Muthirappara (3) Providing Distribution Networks And Fht Cs In Meenachil Panchayaths Etc
|
Organisation | Government of Kerala |
Tender Id | 2023_KWA_583705_1 |
Reference Number |
WRD/KWA-CE(SR) /TR/7902/2022_26_6_5/1 |
Tender Fee | 16540 |
EMD | 5 Lakh |
Tender Value | |
Place | O/o the SE, PHC, KWA Kottayam |
Link | https://etenders.kerala.gov.in |
Start Date | June 23, 2023 21:30 |
End Date |
13/07/2023 ( Expired 677 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreZonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Read moreEmpanelment of agencies for supply of different glasswares and miscellaneous items for various water testing laboratories under jjm, assam
Empanelment of agencies for supply of different glasswares and miscellaneous items for various water testing laboratories under jal jeevan mission, assam
Read moreEmpanelment of agencies for supply of laboratory instruments for various water testing laboratories under jjm, assam
Empanelment of agencies for supply of laboratory instruments for various water testing laboratories under jal jeevan mission, assam
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreOperation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Read moreRenewal work on chomu ajeetgarh shahpura two lane bot road (km. 0/0 to km. 36/0 on sh 37 and 109/100 to 125/100 on sh 13 except dlp portion)
Renewal work on chomu ajeetgarh shahpura two lane bot road (km. 0/0 to km. 36/0 on sh 37 and 109/100 to 125/100 on sh 13 except dlp portion)
Read moreMaintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25
Maintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25
Read moreJjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Jjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Read moreof your Industry type