Tender Details
Particulars | Details |
---|---|
Title |
Rising Of Existing Strom Water Drain Side Wall At Thirumalai Street In Ward No. 07
|
Description |
Rising Of Existing Strom Water Drain Side Wall At Thirumalai Street In Ward No. 07
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_MAWS_404360_1 |
Reference Number |
45/2023-24/25 |
Tender Fee | 0 |
EMD | 6850 |
Tender Value | |
Place | S.N.High road Main office Tirunelveli Corproration |
Link | https://tntenders.gov.in |
Start Date | December 29, 2023 14:30 |
End Date |
11/01/2024 ( Expired 497 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Read moreConstruction of drain from boundary of pwd rest house to chichli tiraha in rajendra babu ward, nagar palika parishad gadarwara
Construction of drain from boundary of pwd rest house to chichli tiraha in rajendra babu ward, nagar palika parishad gadarwara
Read moreSitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Sitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreCa no cwe bly ge w 07 of 2025 26 provn of roof top solar plants totaling 200 kw at certain bldgs at bareilly under ge west bareilly
Ca no cwe bly ge w 07 of 2025 26 provn of roof top solar plants totaling 200 kw at certain bldgs at bareilly under ge west bareilly
Read moreof your Industry type