Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 1x39 Mtr Span Truss Girder Bridge Over Nallah Qazinag At Jub Chitterkote (5054 Nabard Ridff Xxx
|
Description |
Construction Of 1x39 Mtr Span Truss Girder Bridge Over Nallah Qazinag At Jub Chitterkote (5054 Nabard Ridff Xxx
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5500 |
EMD | 9.61 Lakh |
Tender Value | |
Place | tangdar |
Link |
AAAAAAAAAA Login to view |
Start Date | May 06, 2025 15:30 |
End Date |
26/05/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Construction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Read moreUpgradation of existing bridge (peru) at km 27.595 by 65 m span pmt bridge, existing 60.45 m span rcc t beam bridge (dhunari) at km 48.846 by constructing 65 m span pmt bridge, and existing 365.00 m span rcc t beam bridge (ujh) at km 54.380 by cons
Upgradation of existing bridge (peru) at km 27.595 by 65 m span pmt bridge, existing 60.45 m span rcc t beam bridge (dhunari) at km 48.846 by constructing 65 m span pmt bridge, and existing 365.00 m span rcc t beam bridge (ujh) at km 54.380 by cons
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreDesign and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Read moreConstruction of steel bridge including the supply and fabrication of steel girder, installation of bearings, over hindon canal and feeder canal for fire tender movement at new ashok nagar for delhi- ghaziabad- meerut namo bharat corridor.
Construction of steel bridge including the supply and fabrication of steel girder, installation of bearings, over hindon canal and feeder canal for fire tender movement at new ashok nagar for delhi- ghaziabad- meerut namo bharat corridor.
Read moreConstruction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreConstruction of 1000 cum capacity (staging height 20 mtr. ) over head reservoir at salbagan , ward no-18 within durgapur municipal corporation as per departmental design, drawing and specification etc.
Construction of 1000 cum capacity (staging height 20 mtr. ) over head reservoir at salbagan , ward no-18 within durgapur municipal corporation as per departmental design, drawing and specification etc.
Read moreConstruction of paver block road from debabrata debnath house to sajal saha house at chandipara( ward no-06) road l-100.00 mtr and at pwd type-iii and type-ii quarter complex under pwd(randb) amarpur sub-division -i during the year 2025-26/sh- gsb, s
Construction of paver block road from debabrata debnath house to sajal saha house at chandipara( ward no-06) road l-100.00 mtr and at pwd type-iii and type-ii quarter complex under pwd(randb) amarpur sub-division -i during the year 2025-26/sh- gsb, s
Read moreof your Industry type