Tender Details

Particulars Details
Title
So Vs For Dry Ash Handling System
Description
Organisation Materials Management | Ministry of Coal
Tender Id GEM/2023/B/3622294
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date June 29, 2023 20:57
End Date
Expired 20/07/2023

Expired 1137 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

AVCON CONTROLS PRIVATE LIMITED

Contract Value

1425000

Tender Status: active
Buyer Name: Indumathy Thiyagarajan
Ministry: Ministry Of Coal
Department: Materials Management
Organisation: Nlc India Limited

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 AVCON CONTROLS PRIVATE LIMITED Make : AVCON Model : R431E06/AD/S4/V/BSP:M36-SQ/H/WP67:220VAC50Hz Title : 4-Way 5-Port, 2-postone, Single Solenoid, Pilot Operated, Poppet Type Valve with Manual Override 20-07-2023 13:46:58 MII MSE Qualified
2 EQUIPMENT FABRICATORS TRADERS Make : Rotex Model : 51400-6-2G-B1-S2+I-230VAC-22 Title : 51400-6-2G-B1-S2+ I-230VAC-22 Rotex 19-07-2023 18:52:39 MII Qualified
3 IMI NORGREN HERION PRIVATE LIMITED Make : Norgren Model : VCB22B517A-A B219J Title : SOLENOID VALVE FOR DRY ASH SYSTEM 18-07-2023 16:34:09 MII Disqualified

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
4-Way 5-Port, 2-postone, Single Solenoid, Pilot Operated, Poppet Type Valve with Manual Override AVCON R431E06/AD/S4/V/BSP:M36-SQ/H/WP67:220VAC50Hz 300 ₹ 1425000.000
Similar Tenders
Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp

Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp

Read more
Paddy purchase handling work for agra region

Paddy purchase handling work for agra region

Read more
Routine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no3

Routine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no 3

Read more
Shifting of refused derived fuel (rdf) from dry waste collection centres (dwccs) and processing plants to bidadi kpcl waste to energy plant and shifting of ash from waste to energy plant to landfill, phase-4

Shifting of refused derived fuel (rdf) from dry waste collection centres (dwccs) and processing plants to bidadi kpcl waste to energy plant and shifting of ash from waste to energy plant to landfill, phase-4

Read more
Dry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27

Dry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27

Read more
Selection and empanelment of transportation cum handling contractor for main transportation of food grains at district nawada for 03 (three) posts.

Selection and empanelment of transportation cum handling contractor for main transportation of food grains at district nawada for 03 (three) posts.

Read more
Selection and empanelment of transportation-cum-handling contractors for main transportation of food grains in muzaffarpur district

Selection and empanelment of transportation-cum-handling contractors for main transportation of food grains in muzaffarpur district

Read more
Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.

Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years

Read more
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise