Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Bharat Petroleum Corporation Limited (Bpcl Kr) Seeks Bids For Under Flow/Overflow Wier Arrangement 🌊🛠️ Bharat Petroleum Corporation Limited (Bpcl Kr) Is Calling For Bids From Experienced Contractors For The Installation Of An Under Flow/Overflow Wier Arrangement At The Downstream End Of A Canal Behind The Eco Park. 📅 Bid Submission Deadline: July 17, 2024, 2:00 Pm This Project Is Part Of The Ongoing Infrastructure Development And Requires A Contractor With A Proven Track Record In Similar Projects. Interested Parties Should Review The Tender Documents For Detailed Specifications And Submission Guidelines. Keywords: Under Flow/Overflow Wier, Canal, Eco Park, Bharat Petroleum Corporation Limited, Infrastructure Development, Public Sector Undertaking, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Under Fllow / Overflow Wier Arrangement Down Stream End Of Canal Behind Eco Park Bpcl Kr
|
| Description |
Under Fllow / Overflow Wier Arrangement Down Stream End Of Canal Behind Eco Park Bpcl Kr
|
| Organisation | Bharat Petroleum Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_BPCL_16961 |
|
Reference Number |
1000420458 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | As per Tender Document |
| Link |
View Original Tender Notice
https://bpcltenders.eproc.in |
| Start Date | July 02, 2024 22:30 |
| End Date |
Expired
17/07/2024
Expired 819 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General urgent rectification work iip 2024 25 crds urgent rectification works to canal bed at up stream and down stream of rbmc main shutter general civil work
Rectification works
Read moreConstruction of deep drain along the road side crossing at head works of ranjan canal near temple down stream side.
Construction of deep drain along the road side crossing at head works of ranjan canal near temple down stream side.
Read moreCreation of additional sump page area towards down stream of laxman nallah behind east dozer section at gevra project of gevra area.
Creation of additional sump page area towards down stream of laxman nallah behind east dozer section at gevra project of gevra area.
Read moreRlbcd-43/ 2023-24 repair and restoration of down stream side appron of cd cum aqueduct near rd 25.3km of parjang branch canal.
Canal improvement work
Read moreGarden maintenance work of vibhuti park ist and iind both at down stream of fateh sagar lake, planters at fs pal and planters from neelkanth mahadev to fatehsagar overflow( 2025-26) 9008
Garden maintenance work of vibhuti park ist and iind both at down stream of fateh sagar lake, planters at fs pal and planters from neelkanth mahadev to&#x0d fatehsagar overflow( 2025-26) 9008
Read moreConstruction of mild steel pipe barrel type well syphon structure at rd 28005 m of rajghat left bank canal in down stream of lower orr dam.
Construction of mild steel pipe barrel type well syphon structure at rd 28005 m of rajghat left bank canal in down stream of lower orr dam.&#x0d
Read moreConstruction of mild steel pipe barrel type well syphon structure at rd 28005 m of rajghat left bank canal in down stream of lower orr dam
Construction of mild steel pipe barrel type well syphon structure at rd 28005 m of rajghat left bank canal in down stream of lower orr dam
Read moreRemoval of silt deposited in seepage drain of tons barrage and construction of concrete wall at down-stream of syphon at rd 0.73 km of link canal.
Removal of silt deposited in seepage drain of tons barrage and construction of concrete wall at down-stream of syphon at rd 0.73 km of link canal.
Read moreRepairing embankment of canal in km 37 of hrbc m and r to aqueduct at ch 30795 and 35210 removing the silt and bushy shruby jungal at up stream and down stream span for clearing the water way of hrbc
Repairing embankment of canal in km 37 of hrbc. m and r to aqueduct at ch 30795 and 35210 removing the silt and bushy shruby jungal at up stream and down stream span for clearing the water way of hrbc
Read moreof your Industry type