Tender Details

About Tender

🏗️ Construction Opportunity: Level Crossing Safety Enhancements 🚗🚦 The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of Two Left Hand Side (Lhs) At Level Crossings No. 60 And 107 Under The Sr.Den Ii Section Of Izn Division, Gorakhpur. 🛤️ 📅 Submission Deadline: April 17, 2024, 3:00 Pm Interested Contractors Must Submit A Tender Along With An Earnest Money Deposit (Emd) Of Inr 679,500. 💰 Detailed Tender Documents Are Available For Review To Gain Comprehensive Insights Into The Project Scope And Requirements. Keywords: Construction, Level Crossing, Safety, Ministry Of Railways, Infrastructure, Tender, Gorakhpur, Earnest Money Deposit (Emd)
Particulars Details
Title
Construction Of 02 Nos. Lhs At Level Crossing No.60 &Amp 107 Under The Sanctioned Work Of Construction Of 05 Lhs At Level Crossing In Sr.Den Ii Section Of Izn Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74244092
Reference
Number
NER-IZN-2024-62
Tender Fee 0
EMD 6.8 Lakh
Tender Value -
Place Gorakhpur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74244092/viewNitPdf_4516658.pdf

Start Date March 20, 2024 00:11
End Date
Expired 17/04/2024

Expired 914 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Launching of box segments in c/with construction of lhs (5m x 5m) in lieu of unmanned level crossing no. c-85a at km 117.492 on ldh- fzr section under aden-1/fzr.

Launching of box segments in c/with construction of lhs (5m x 5m) in lieu of unmanned level crossing no. c-85a at km 117.492 on ldh- fzr section under aden-1/fzr.

Read more
Construction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d

Construction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d

Read more
Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)

Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)

Read more
Heavy repair to station building, service building, staff quarters and level crossing by plastering, wall finishng, flooring, roofing, water booths, pf copings, pf walls, sanitary and toilet fitting etc. in the section of sse(w)/line/lko under aden-ii/lko in the jurisdiction of sr.den-v/lko. (estt. no. 228-2026)

Heavy repair to station building, service building, staff quarters and level crossing by plastering, wall finishng, flooring, roofing, water booths, pf copings, pf walls, sanitary and toilet fitting etc. in the section of sse(w)/line/lko under aden-ii/lko in the jurisdiction of sr.den-v/lko. (estt. no. 228-2026)

Read more
Level crossing fittings on psc sleepers bg for 60 kg as per rdso drg no. t-4916 (alt-3) including fittings c.i. brackets, c.i. distance bracket, turn bolts, single coil spring washer, plate screw with latest corrigendum issued up to 15 days before the date of opening of tender. list of quantity of one set fittings for level crossing psc sleepers 60 kg as per rdso drg. no. t-4916 (alt-3) is as under : (1 ) c. i. bracket to rdso drg. no. t-4917 and speci. irs:t-10 , qty. 2 nos. (2) c. i. distanc

Level crossing fittings on psc sleepers bg for 60 kg as per rdso drg no. t-4916 (alt-3) including fittings c.i. brackets, c.i. distance bracket, turn bolts, single coil spring washer, plate screw with latest corrigendum issued up to 15 days before the date of opening of tender. list of quantity of one set fittings for level crossing psc sleepers 60 kg as per rdso drg. no. t-4916 (alt-3) is as under : (1 ) c. i. bracket to rdso drg. no. t-4917 and speci. irs:t-10 , qty. 2 nos. (2) c. i. distanc

Read more
Level crossing fittings on psc sleepers bg for 60 kg as per rdso drg no. t-4916 (alt-3) including fittings c.i. brackets, c.i. distance bracket, turn bolts, single coil spring washer, plate screw with latest corrigendum issued up to 15 days before the date of opening of tender. list of quantity of one set fittings for level crossing psc sleepers 60 kg as per rdso drg. no. t-4916 (alt-3) is as under : (1 ) c. i. bracket to rdso drg. no. t-4917 and speci. irs:t-10 , qty. 2 nos. (2) c. i. distanc

Level crossing fittings on psc sleepers bg for 60 kg as per rdso drg no. t-4916 (alt-3) including fittings c.i. brackets, c.i. distance bracket, turn bolts, single coil spring washer, plate screw with latest corrigendum issued up to 15 days before the date of opening of tender. list of quantity of one set fittings for level crossing psc sleepers 60 kg as per rdso drg. no. t-4916 (alt-3) is as under : (1 ) c. i. bracket to rdso drg. no. t-4917 and speci. irs:t-10 , qty. 2 nos. (2) c. i. distanc

Read more
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Read more
Request for proposal (rfp) for providing project consultant (pc) for providing comprehensive consultancy services from the stage of feasibility study & dpr preparation for elimination of level crossing gates in nf railway by constructing rob and/ rub/lhs/other structures/ road diversion as required including detailed design of required components of finalised scheme, tendering for execution of works as per finalized scheme, techno-managerial consultancy, processing & facilitation

Request for proposal (rfp) for providing project consultant (pc) for providing comprehensive consultancy services from the stage of feasibility study & dpr preparation for elimination of level crossing gates in nf railway by constructing rob and/ rub/lhs/other structures/ road diversion as required including detailed design of required components of finalised scheme, tendering for execution of works as per finalized scheme, techno-managerial consultancy, processing & facilitation

Read more
Request for proposal (rfp) for providing project consultant (pc) for providing comprehensive consultancy services from the stage of feasibility study & dpr preparation for elimination of level crossing gates in nf railway by constructing rob and/ rub/lhs/other structures/ road diversion as required including detailed design of required components of finalised scheme, tendering for execution of works as per finalized scheme, techno-managerial consultancy, processing & facilitation

Request for proposal (rfp) for providing project consultant (pc) for providing comprehensive consultancy services from the stage of feasibility study & dpr preparation for elimination of level crossing gates in nf railway by constructing rob and/ rub/lhs/other structures/ road diversion as required including detailed design of required components of finalised scheme, tendering for execution of works as per finalized scheme, techno-managerial consultancy, processing & facilitation

Read more
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a

Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise