Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Urgent: Road Restoration Services For Pmgsy Division Doda 🌨️ The National Rural Roads Development Agency (Nrrda), Under The Central Government, Is Seeking Bids For The Restoration Of Roads Under The Jurisdiction Of Pmgsy Division Doda On An Emergency Basis. The Work Includes Snow Clearance And Filling Of Ruts, To Be Completed Within The Financial Year 2024 25. 📍 Location: Pmgsy Division Doda 📅 Deadline: April 29, 2024, 4:00 Pm 💲 Tender Fee: Inr 600 💲 Earnest Money Deposit (Emd): Inr 20,000 Interested Bidders Should Possess The Necessary Expertise And Equipment To Handle Emergency Road Restoration, Particularly In Snow Affected Areas. Proposals Must Include Detailed Methodologies, Timelines, And Cost Estimates For The Specified Lengths Of Roads. Keywords: Road Restoration, Pmgsy Division Doda, Emergency Services, Snow Clearance, Nrrda, Central Government, Tender, Bid, Emd| Particulars | Details |
|---|---|
| Title |
Construction Of Toe Wall And Drain In The Sinking Stretch Near Rd 260m Uphill Side Of Inspection Road Chep Iii
|
| Description |
Same As Per Enit
|
| Organisation | JKSPDC | State Govt. and UT |
| Tender Id | 2024_JKRRD_133792_1 |
|
Reference Number |
ENIT 03 OF 2024-25 |
| Tender Fee | 800 |
| EMD | 23980 |
| Tender Value | - |
| Place | Udhampur |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=743133 |
| Start Date | August 06, 2024 18:30 |
| End Date |
Expired
27/08/2024
Expired 782 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Khetar khul improvement renovation of khul by way of const of parapet wall bed treatment rd 0 to 10m and 130 to 200m and 210to 260m
Khetar khul improvement renovation of khul by way of const of parapet wall bed treatment rd 0 to 10m and 130 to 200m and 210to 260m
Read moreEstimate for permanent plugging of breach at rd 13980 ( 100 ft ) with toe wall and repair of fall structure at rd 9005 of bhadaur disty by brick lining.
Estimate for permanent plugging of breach at rd 13980 ( 100 ft ) with toe wall and repair of fall structure at rd 9005 of bhadaur disty by brick lining.
Read moreEstimate for permanent plugging of breach at rd 50( 125 ft ) with toe wall of bhadaur disty by brick lining.
Estimate for permanent plugging of breach at rd 50( 125 ft ) with toe wall of bhadaur disty by brick lining.
Read moreHiring of cat iii derrick inspection remedial repair recertification services for ongc owned rigs
Hiring of cat iii derrick inspection remedial repair recertification services for ongc owned rigs
Read moreRenovation and improvement of kuchagaon minor-i within rd 50m to rd 900m, rd 1500m to rd 2000m and rd 2500m to rd 5815m, kuchagaon s/m_i within rd 00m to rd 910m, kuchagaon s/m-ii within rd 00m to rd 1650m and kuchagaon s/m-iii within rd 00m to rd 24
Renovation and improvement of kuchagaon minor-i within rd 50m to rd 900m, rd 1500m to rd 2000m and rd 2500m to rd 5815m, kuchagaon s/m_i within rd 00m to rd 910m, kuchagaon s/m-ii within rd 00m to rd 1650m and kuchagaon s/m-iii within rd 00m to rd 24
Read moreConstruction of type- iii staff quarter (6 unit) at manu rd block under rd manu division during the fy 2026-27(2nd call).
Construction of type- iii staff quarter (6 unit) at manu rd block under rd manu division during the fy 2026-27(2nd call).
Read moreEstimate for reconstruction of water course of outlet rd 14651/14652/r of new tarmala link channel part iii
Estimate for reconstruction of water course of outlet rd 14651/14652/r of new tarmala link channel part iii
Read moreC.o 61.00 meter span bailey bridge on baspa river on shong palingche road at rd 2.360 in distt. kinnaur hp. sh. c.o balance work of palingche side abutment i.c toe wall of the bridge abutment.
C.o 61.00 meter span bailey bridge on baspa river on shong palingche road at rd 2.360 in distt. kinnaur hp. sh. c.o balance work of palingche side abutment i.c toe wall of the bridge abutment.
Read moreSet of gaskets for mrb duct inspection cover. a set consisting of 03 items follows:- (i) mrb duct inspection cover gasket as per drg no. tata/rs/misc/1104. qty-01 no/set. (ii) mrb duct inspection cover gasket as per drg no. tata/rs/misc/1105. qty-01 no/set.(iii)mrb duct inspection cover gasket as per drg no. tata/rs/misc/1106.qty-01 no/set.total qty=03 nos /set.
Set of gaskets for mrb duct inspection cover. a set consisting of 03 items follows:- (i) mrb duct inspection cover gasket as per drg no. tata/rs/misc/1104. qty-01 no/set. (ii) mrb duct inspection cover gasket as per drg no. tata/rs/misc/1105. qty-01 no/set.(iii)mrb duct inspection cover gasket as per drg no. tata/rs/misc/1106.qty-01 no/set.total qty=03 nos /set.
Read moreof your Industry type