Tender Details

Particulars Details
Title
Bilaspur Division Provision/Modification Of Ohe In Connection With Removing Critical Implantation Locations In Curvature Between Cph Jsg Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73150190
Reference
Number
TRD-BSP-212-23-24
Tender Fee 0
EMD 2.85 Lakh
Tender Value -
Place Bilaspur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73150190/viewNitPdf_4457079.pdf

Start Date February 13, 2024 19:25
End Date
Expired 06/03/2024

Expired 954 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between bsp-jsg including cph-gad and khs-dharamjaigarh of bilaspur division for a period of 24 months.

Outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between bsp-jsg including cph-gad and khs-dharamjaigarh of bilaspur division for a period of 24 months.

Read more
Provision/modification of ohe arrangement at coaching depot, bilaspur for pit lines 2 & 3

Provision/modification of ohe arrangement at coaching depot, bilaspur for pit lines 2 & 3

Read more
Ohe modification work and other allied work in connection with elimination of level crossing gate 241 between bajwa-karchiya at km 404/24-26

Ohe modification work and other allied work in connection with elimination of level crossing gate 241 between bajwa-karchiya at km 404/24-26

Read more
Ohe modification work due to construction of 5 no. lhs between orw - msw section and 5 no. lhs between gkp- orw section (total 10 no. lhs) in lucknow division of n.e. railway.

Ohe modification work due to construction of 5 no. lhs between orw - msw section and 5 no. lhs between gkp- orw section (total 10 no. lhs) in lucknow division of n.e. railway.

Read more
Tvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section

Tvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section

Read more
Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations

Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations

Read more
Modification of ohe due launching scheme for proposed rob at rly km 317/29 - 318/01 in between station goldenganj - chhapra gramin junction and at road km 157+880 of nh - 19.

Modification of ohe due launching scheme for proposed rob at rly km 317/29 - 318/01 in between station goldenganj - chhapra gramin junction and at road km 157+880 of nh - 19.

Read more
Design, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.

Design, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.

Read more
(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119

(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119

Read more
Design, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway

Design, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway

Read more
Click Here to Download Dockets