Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Notice: Overhead Electrification (Ohe) Works For Bilaspur Division 🔌 The Ministry Of Railways, Central Government, Invites Bids From Eligible Contractors For The Provision Or Modification Of Overhead Electrification (Ohe) Infrastructure In The Bilaspur Division. 🛠️ 📅 Bid Submission Deadline: April 24, 2024, 3:00 Pm The Tender Fee Is Inr 0, With An Earnest Money Deposit (Emd) Of Inr 285,000. Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, For The Removal Of Critical Implantation Locations In The Curvature Between The Cph And Jsg Sections. Keywords: Ministry Of Railways, Overhead Electrification, Ohe, Bilaspur Division, Electrical Works, Government Tender, Emd, Tender Notice| Particulars | Details |
|---|---|
| Title |
Bilaspur Division Provision/Modification Of Ohe In Connection With Removing Critical Implantation Locations In Curvature Between Cph Jsg Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74465296 |
|
Reference Number |
TRD-BSP-225-24-25 |
| Tender Fee | 0 |
| EMD | 2.85 Lakh |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74465296/viewNitPdf_4526915.pdf |
| Start Date | April 02, 2024 21:21 |
| End Date |
Expired
24/04/2024
Expired 906 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between bsp-jsg including cph-gad and khs-dharamjaigarh of bilaspur division for a period of 24 months.
Outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between bsp-jsg including cph-gad and khs-dharamjaigarh of bilaspur division for a period of 24 months.
Read moreProvision/modification of ohe arrangement at coaching depot, bilaspur for pit lines 2 & 3
Provision/modification of ohe arrangement at coaching depot, bilaspur for pit lines 2 & 3
Read moreOhe modification work and other allied work in connection with elimination of level crossing gate 241 between bajwa-karchiya at km 404/24-26
Ohe modification work and other allied work in connection with elimination of level crossing gate 241 between bajwa-karchiya at km 404/24-26
Read moreOhe modification work due to construction of 5 no. lhs between orw - msw section and 5 no. lhs between gkp- orw section (total 10 no. lhs) in lucknow division of n.e. railway.
Ohe modification work due to construction of 5 no. lhs between orw - msw section and 5 no. lhs between gkp- orw section (total 10 no. lhs) in lucknow division of n.e. railway.
Read moreModification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations
Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations
Read moreModification of ohe due launching scheme for proposed rob at rly km 317/29 - 318/01 in between station goldenganj - chhapra gramin junction and at road km 157+880 of nh - 19.
Modification of ohe due launching scheme for proposed rob at rly km 317/29 - 318/01 in between station goldenganj - chhapra gramin junction and at road km 157+880 of nh - 19.
Read moreModification to the existing ohe in connection with the construction of two lane rub between atgaon & thansit at kmm.98/2 in kalamgaon at hydraulic bridge on kalyan-manmad section mumbai division of central railway
Modification to the existing ohe in connection with the construction of two lane rub between atgaon & thansit at kmm.98/2 in kalamgaon at hydraulic bridge on kalyan-manmad section mumbai division of central railway
Read moreDesign, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Design, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Read more(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119
(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119
Read moreDesign, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway
Design, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway
Read moreof your Industry type