Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Supply, Fabrication, Erection, Testing Commissioning Of 1200 Mtr. Long Steel Bridge Pylon Rcc Works At Bharat Vandana Park, Sector 20, Dwarka, Delhi At The Risk And Cost Of M/S Nkg Infrastructure Ltd On Epc Basis
|
| Description |
Design, Supply, Fabrication, Erection, Testing Commissioning Of 1200 Mtr. Long Steel Bridge Pylon Rcc Works At Bharat Vandana Park, Sector 20, Dwarka, Delhi At The Risk And Cost Of M/S Nkg Infrastructure Ltd On Epc Basis
|
| Organisation | National Buildings Construction Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_NBCC_784496_1 |
|
Reference Number |
NBCC/SBG/BVP/NIT/2025/27 |
| Tender Fee | 11800 |
| EMD | 24.03 Lakh |
| Tender Value | - |
| Place | Dwarka, New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1088765 |
| Start Date | January 08, 2025 19:30 |
| End Date |
Expired
23/01/2025
Expired 631 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
Read moreExecution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Read moreRectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read more4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.
4laning of warora to wani section of nh930 from km 313.850 to km 332.160 at the risk and cost of the epc contractor (m/s jceg-agipl (jv)) on item rate (percentage) basis in the state of maharashtra.
Read moreRoutine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Routine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Read moreOverlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Read moreRectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreRectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreHt line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Ht line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Read moreof your Industry type