Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work For Const Of Western Side Spur Of Rampur Rudrapur Sec Connecting Nh24 To Nh 87 Bypassing Rampur Town At Risk And Cost Of Contractor On Epc Mode In Uttar Pradesh
|
| Description |
Balance Work For Const Of Western Side Spur Of Rampur Rudrapur Sec Connecting Nh24 To Nh 87 Bypassing Rampur Town At Risk And Cost Of Contractor On Epc Mode In Uttar Pradesh.
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 20000 |
| EMD | 1.3 Crore |
| Tender Value | 130.42 Crore |
| Place | |
| Link | Login to view |
| Start Date | July 20, 2026 23:15 |
| End Date |
Open
22/10/2026
9 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Read moreRectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Read moreRoutine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Routine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)
Read moreOverlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Read moreRectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreRectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read more8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
Read moreOperation and maintenance work at risk and cost of epc contractor at selected stretches of puintola tangi of nh 16 in the state of odisha
Operation and maintenance work at risk and cost of epc contractor at selected stretches of puintola tangi of nh 16 in the state of odisha
Read moreEmergent repair works frm sargaon to bilaspur sec on risk and cost of the epc contractor for 4laning of sargaon bilaspur from km91.026 to km126.525 of nh130/49 on epc mode in chhattisgarh.
Emergent repair works frm sargaon to bilaspur sec on risk and cost of the epc contractor for 4laning of sargaon bilaspur from km91.026 to km126.525 of nh130/49 on epc mode in chhattisgarh.
Read moreCs for ae for cons. of realignment of nh-87 (new nh109) sec. of rudrapur kathgodam from design ch. 0.000 (54.050 of nh 87) to design ch. 7.875 (61.550 of nh 87) due to proposed expansion of pantnagar airport (dl 7.875 km) in uttarakhand on epc mode
Cs for ae for cons. of realignment of nh-87 (new nh109) sec. of rudrapur kathgodam from design ch. 0.000 (54.050 of nh 87) to design ch. 7.875 (61.550 of nh 87) due to proposed expansion of pantnagar airport (dl 7.875 km) in uttarakhand on epc mode
Read moreof your Industry type