Tender Details
Particulars | Details |
---|---|
Title |
4 X 3 Ft Flex Stand Board Double Side,4 X 3 Ft Flex Backlight With Lags,3 X 2 Ft Flex With Frame,3
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/5820328 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 15, 2025 02:28 |
End Date |
04/02/2025 ( Expired 100 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreRenovation and modernisation of maithon hydel station unit 1 and 3 (2 x 20 mw)
Renovation and modernisation of maithon hydel station unit 1 and 3 (2 x 20 mw)
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Construction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Read moreConstruction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Construction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Read moreof your Industry type