Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Miscellaneous Ug Job (A) Pcc Work In Between Inclines And Rviib Seam (B) Re Plastering Of 2 Nos Old Isolation Stopping (C) Construction A Wall At Pit Bottom Of Rviic Seam (D) Old Bh Filling Of Cm Project Of Nakrakonda Kumardihi B Colliery.
|
| Description |
Miscellaneous Ug Job (A) Pcc Work In Between Inclines And Rviib Seam (B) Re Plastering Of 2 Nos Old Isolation Stopping (C) Construction A Wall At Pit Bottom Of Rviic Seam (D) Old Bh Filling Of Cm Project Of Nakrakonda Kumardihi B Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_340964_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/25-26/Min/28 Dt 05.08.2025 |
| Tender Fee | 0 |
| EMD | 7900 |
| Tender Value | - |
| Place | Nakrakonda Kumardihi B Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353456 |
| Start Date | August 05, 2025 23:30 |
| End Date |
Expired
16/08/2025
Expired 421 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 12 nos isolation stopping to isolate the panel pb1 and pb2 at rviib seam of cm project under nakrakonda kumardihi b colliery
Construction of 12 nos isolation stopping to isolate the panel pb1 and pb2 at rviib seam of cm project under nakrakonda kumardihi b colliery
Read moreConstruction of 5nos ventilation stoppings at rviic seam to establish the ventilation route of rviib seam of cm project under nakrakonda kumardihi b colliery
Construction of 5nos ventilation stoppings at rviic seam to establish the ventilation route of rviib seam of cm project under nakrakonda kumardihi b colliery
Read moreInstallation of underground substation in rviib seam and power circuit arrangement behind load centre from rviic and rviib seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Installation of underground substation in rviib seam and power circuit arrangement behind load centre from rviic and rviib seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreConstruction of 10 nos man holes at drifts from rviic to rviib seam and roof bolting supports at minus 8l to minus 6l along minus 6d in rviic seam of cm project under nakrakonda kumardihi b colliery
Construction of 10 nos man holes at drifts from rviic to rviib seam and roof bolting supports at minus 8l to minus 6l along minus 6d in rviic seam of cm project under nakrakonda kumardihi b colliery
Read moreConstruction of 16 nos supporting pillar (1.0m x1.0m) thick in rviia seam, rviib seam and rviic seam of no 3 and 4 unit of kumardihi a collierv
Construction of 16 nos supporting pillar (1.0m x1.0m) thick in rviia seam, rviib seam and rviic seam of no 3 and 4 unit of kumardihi a collierv
Read moreInstallation of haulage in rviib seam and replacement of power cable behind load centre at nakrakonda kumardihi b colliery
Installation of haulage in rviib seam and replacement of power cable behind load centre at nakrakonda kumardihi b colliery
Read moreDrilling of 5 no (five) nx size upward non coring boreholes (4 nos from rviic to rviib seam lowering the water of running development panels of rviib to rviic seam and 1 no from rviic to rviia seam for lowering the water from rviia to rviic seam) an
Drilling of 5 no (five) nx size upward non coring boreholes (4 nos from rviic to rviib seam lowering the water of running development panels of rviib to rviic seam and 1 no from rviic to rviia seam for lowering the water from rviia to rviic seam) an
Read moreConstruction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.
Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.
Read morePcc work and construction of 4 nos pillar for installation and lifting the belt conveyor at the intersection point of rviib seam and inclines of cm project under nakrakonda kumardihi b colliery
Pcc work and construction of 4 nos pillar for installation and lifting the belt conveyor at the intersection point of rviib seam and inclines of cm project under nakrakonda kumardihi b colliery
Read moreRepairing of old sectionalization isolation stopping of rvii seam at shamsundarpur colliery
Repairing of old sectionalization isolation stopping of rvii seam at shamsundarpur colliery
Read moreof your Industry type