Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Strengthening Of Damaged Arch Bridge (Km 02/Bc 13 14), Construction Of Rcc Box By Pushing Method For Canal Crossing Works At Km. 871/30 31 Between Anuppur Amlai Section And Other Miscellaneous Civil Work Under The Jurisdiction Of Assistant Divisional Engineer/Shahdol Of Bilaspur Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77514220 |
Reference Number |
DRM-ENGG-BSP-T-91-24-25 |
Tender Fee | 0 |
EMD | 1.01 Lakh |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77514220/viewNitPdf_4721391.pdf |
Start Date | September 30, 2024 22:04 |
End Date |
25/10/2024 ( Expired 238 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane road over bridge in lieu of existing level crossing no. 42 at km 96/13-14 in between sakhoti tanda - khatauli station with bow string girder/bow shaped truss along with construction of lhs by pushing method and other allied works on gzb-sre section of delhi division.
For complete deion and other details, please refer to tender
Read moreStrengthening of damaged arch bridge (km 02/bc-13-14), construction of rcc box by pushing method for canal crossing works at km. 871/30-31 between anuppur-amlai section and other miscellaneous civil work under the jurisdiction of assistant divisional engineer/shahdol of bilaspur division.
For complete deion and other details, please refer to tender
Read moreSecunderabad division electrical maintenance department: schedule a- sc-division-pdpl-nzb section: new crossing station in between armu-nzb at km 162 to 164. schedule b - (i) replacement of lc60 with rcc box(rub) dpr sanction proposals km:118/13-14 between hbu-bhlk in den/west/sc jurisdiction (ii) replacement of lc39 with rcc box(rub) dpr sanction proposals km:82/11-12 between mtv-bidr in den/west/sc jurisdiction (iii) replacement of lc20 with rcc box(rub) dpr sanction proposals km 58&
For complete deion and other details, please refer to tender
Read moreBalance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Balance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Read moreConstruction of rob at level crossing no.bk-66 (railway portion only) at km. 883/11-13 between buhrar-amlai section under the jurisdiction of assistant divisional engineer shahdol of bilaspur division.
For complete deion and other details, please refer to tender
Read moreConstruction of railway portion of four lane road over bridge (1 x 36.00 m composite girder) at km. 500/13 - 14 in lieu of level crossing no. 254 x in ratlam - khandwa section, in rajendra nagar yard between rajendra nagar - rau stations of ratlam division western railway
For complete deion and other details, please refer to tender
Read more(1) sonpur - parmanandpur :- road over bridge in lieu of level crossing no. 1a. (lhs to be constructed in lieu of rob.) provision of limited height subway (lhs) in lieu of level crossing no. 1 a at km. 273/2-3 (273.204) ep km -273/12-14 between sonpur - permanandpur railway station on sonpur chhapra section by normal pushing method size (1x5.0x3.0 mtr) rcc box. (2) sonpur chhapra kachhery :- construction of 2.0 x 5.0 x 4.0 mtr limited height subway at lc no. 4/spl between sonpur -
For complete deion and other details, please refer to tender
Read moreSonpur - parmanandpur :- road over bridge in lieu of level crossing no. 1a. (lhs to be constructed in lieu of rob) provision of limited height subway (lhs) in lieu of level crossing no. 01 a at km. 273/2-3 (273.204) ep km. - 273/12-14 between sonpur - permanandpur railway station on sonpur - chhapra section by normal pushing method size (1 x 5.0 x 3.0 mtr) rcc box.
For complete deion and other details, please refer to tender
Read moreConstruction of limited height sub-way/road under bridge (lhs/rub) by box pushing technique in lieu of closing of level crossing no.cg-5 at km.671/10-12 between champa-balpur and level crossing no.cg-17 between saragbundia-plau section under the jurisdiction of assistant divisional engineer/champa.
For complete deion and other details, please refer to tender
Read moreConstruction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method) 2nd call
Construction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method) 2nd call
Read moreof your Industry type