Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps Ii Mi Circle Mpm Ac Plant Carrying Out Up Keeping Routine Prive
|
| Description |
Nctps Ii Mi Circle Mpm Ac Plant Carrying Out Up Keeping Routine Prive
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_502850_1 |
|
Reference Number |
CE NCTPS II SE M I O M 226 2024 25 |
| Tender Fee | 0 |
| EMD | 10300 |
| Tender Value | - |
| Place | SE MI NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=598043 |
| Start Date | November 20, 2024 19:30 |
| End Date |
Expired
05/12/2024
Expired 675 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of chemicals are essential for carrying out anti-larval operations and vector control measures in ghatkesar circle-06 to prevent the outbreak of mosquito-borne diseases. timely procurement is necessary to ensure uninterrupted entomology activities, ghatkesar circle-06, mmc
Procurement of chemicals are essential for carrying out anti-larval operations and vector control measures in ghatkesar circle-06 to prevent the outbreak of mosquito-borne diseases. timely procurement is necessary to ensure uninterrupted entomology activities, ghatkesar circle-06, mmc
Read moreQuotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.
Quotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.
Read moreCarrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part c:providing epabx system
Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part c:providing epabx system
Read moreCleaning of roads, drains, common areas and maintenance of plantation at 24 sbhk premises and spf hostel plantation and up-keeping of toilets at office sheds of civil circle - ii, temporary hostel and intake structure from october - 2026 to march -2027
Cleaning of roads, drains, common areas and maintenance of plantation at 24 sbhk premises and spf hostel plantation and up-keeping of toilets at office sheds of civil circle - ii, temporary hostel and intake structure from october - 2026 to march -2027
Read moreCarrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part d:providing 7.5 kva ups
Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part d:providing 7.5 kva ups
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreCarrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Carrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Read moreNctps ii mi circle mpm unit ii carrying out routine and prive maintenance
Nctps ii mi circle mpm unit ii carrying out routine and prive maintenance
Read moreof your Industry type