Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
E Tender For Removal Of Existing 5 Nos. Actuators, Supply, Installation, Testing And Commissioning Of 5 Nos. New Flame Proof Electrical Actuators Compatible With Existing 16 Inch Dia. Gate Valves And Control Panel At Bd Iii In Oil Dock Of Chennai Po
|
| Description |
E Tender For Removal Of Existing 5 Nos. Actuators, Supply, Installation, Testing And Commissioning Of 5 Nos. New Flame Proof Electrical Actuators Compatible With Existing 16 Inch Dia. Gate Valves And Control Panel At Bd Iii In Oil Dock Of Chennai Po
|
| Organisation | Chennai Port Trust | Central Govt. Ministry/Department |
| Tender Id | 2025_ChPT_879092_1 |
|
Reference Number |
MEE / 20/ 2025 /Dy.CME(MP and OH) |
| Tender Fee | 0 |
| EMD | 81000 |
| Tender Value | |
| Place | Chennai Port Authority |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=924028 |
| Start Date | September 26, 2025 16:30 |
| End Date |
Expired
15/10/2025
Expired 249 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Removal of existing 5 nos. actuators, sitc of 5 nos. new flame proof electrical actuators compatible with existing 16 inch dia. gate valves and control panel at bd iii in oil dock of chennai port authority
Removal of existing 5 nos. actuators, sitc of 5 nos. new flame proof electrical actuators compatible with existing 16 inch dia. gate valves and control panel at bd iii in oil dock of chennai port authority
Read moreSupply testing and commissioning of 5 nos of 16 passengers lift in redevelopment of dhopikana at chetpet chennai
Supply testing and commissioning of 5 nos of 16 passengers lift in redevelopment of dhopikana at chetpet chennai
Read moreRepairing of the 10 inch dia foot valves, 8 inch dia non return valves and 8 inch dia sluice valve, making of nipple and onsite testing and commissioning it with the three nos. of 2000 g.p.m. pumps in operation in mine, under karo ocp, bnk area
Repairing of the 10 inch dia foot valves, 8 inch dia non return valves and 8 inch dia sluice valve, making of nipple and onsite testing and commissioning it with the three nos. of 2000 g.p.m. pumps in operation in mine, under karo ocp, bnk area
Read moreWork of overhauling, calibration, testing , commissioning of siemens make plc control system along with gate valves, electrical drives , all control and instrumentation system of ash handling system of unit 11
Work of overhauling, calibration, testing commissioning of &#x0d siemens make plc control system along &#x0d with gate valves, electrical drives , all control and &#x0d instrumentation system of ash handling system of unit 11
Read moreTtps es circle em ii erection and commissioning of 3 nos lt 3 phase 75 kw lt induction motors heavy oil pump motors flame proof in place of existing life served motors at fuel oil pump house i
Ttps es circle em ii erection and commissioning of 3 nos lt 3 phase 75 kw lt induction motors heavy oil pump motors flame proof in place of existing life served motors at fuel oil pump house i
Read moreWork of overhauling, calibration, testing commissioning of manometry instruments siemens make plc control system along with gate valves, electrical drives all control and instrumentation system of ash handling system of unit 12, 2 x200 mw, btps
Work of overhauling, calibration, testing commissioning of manometry instruments siemens make plc control system along with gate valves, electrical drives all control and instrumentation system of ash handling system of unit 12, 2 x200 mw, btps
Read moreWork of overhauling, calibration, testing commissioning of manometry instruments siemens make plc control system along with gate valves, electrical drives all control and instrumentation system of ash handling system of unit 12, 2 x200 mw, btps
Work of overhauling, calibration, testing commissioning of manometry instruments siemens make plc control system along with gate valves, electrical drives all control and instrumentation system of ash handling system of unit 12, 2 x200 mw, btps
Read moreFabrication erection testing commissioning of 16 nos cr cum whs sluice gate size 1750mm x 2675mm at rd 5310 mtr of gudikhal nallah at po jagannathpur kulida basta under drainage division balasore
Fabrication erection testing commissioning of 16 nos cr cum whs sluice gate size 1750mm x 2675mm at rd 5310 mtr of gudikhal nallah at po jagannathpur kulida basta under drainage division balasore
Read moreTender for replacement of 02 nos existing 15 hp vt pump with 2 nos new submersible slurry pump alongwith replacement of existing gate valves and nrvs including its successful testing and commissioning at transformer hall of larji power house under re
Tender for replacement of 02 nos existing 15 hp vt pump with 2 nos new submersible slurry pump alongwith replacement of existing gate valves and nrvs including its successful testing and commissioning at transformer hall of larji power house under re
Read moreChipping, cleaning, supply of paints and painting the 16, 14, 12, 10, 6 inch dia, etc., fire fighting pipe lines in old trestle from nph to bd-i, nph, oph area and nph to imc terminal at oil dock.
Chipping, cleaning, supply of paints and painting the 16, 14, 12, 10, 6 inch dia, etc., fire fighting pipe lines in old trestle from nph to bd-i, nph, oph area and nph to imc terminal at oil dock.
Read moreof your Industry type