Tender Details

Particulars Details
Title
Repairing Of Submersible Motor Pump Sets 1 Hp To 50 Hp And Spare Parts On Arc Basis Under Wwd.
Description
Repairing Of Submersible Motor Pump Sets 1 Hp To 50 Hp And Spare Parts On Arc Basis Under Wwd.
Organisation Government of Madhya Pradesh
Tender Id 2023_UAD_294180_1
Reference
Number
08 /Store/W.W.D./BMC/2023-24
Tender Fee 10000
EMD 37500
Tender Value
Place Bhopal
Link https://mptenders.gov.in
Start Date August 07, 2023 15:30
End Date

25/08/2023 ( Expired 669 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

Read more
Procurement of bs-vi 50 mini buses with 5 years camc of all chassis spare parts, assemblies and engine

Procurement of bs-vi 50 mini buses with 5 years camc of all chassis spare parts, assemblies and engine

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Construction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)

Construction of 4 new foot over bridges in&amp#x0d indore on design, built, operate and transfer&amp#x0d basis and maintenance of existing three fobs&amp#x0d for license period of 10 years (extendable to&amp#x0d five years)

Read more
Repair of defective capacitor banks installed in the existing ehv, hv substations of hpsebl including supply and replacement of various parts, equipment on turnkey basis in hp

Repair of defective capacitor banks installed in the existing ehv, hv substations of hpsebl including supply and replacement of various parts, equipment on turnkey basis in hp

Read more
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Read more
Electrification of un-electrified (ue) households of budgam district under dharti aaba- janjatiya gram utkarsh abhiyan (da-jgua) - on design, supply, installation, testing and commissioning basis

Electrification of un-electrified (ue) households of budgam district under dharti aaba- janjatiya gram utkarsh abhiyan (da-jgua) - on design, supply, installation, testing and commissioning basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise