Tender Details

Particulars Details
Title
Htc Id 52 Pr 20013509
Description
Annual Servicing Maintenance For Circuit Breaker At Arai Htc And Fid Chakan
Organisation Department of Heavy Industry | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 0
Tender Value
Place HTC, ARAI
Link

AAAAAAAAAA

Login to view
Start Date July 04, 2025 18:10
End Date

11/07/2025 ( 0 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of vup for rectification of blackspot id pb 03 164 of series 2017 19 at km. 287.710 grain market bhikhi on nh 148b in the state of punjab including utility shifting and excluding gst

Construction of vup for rectification of blackspot id pb 03 164 of series 2017 19 at km. 287.710 grain market bhikhi on nh 148b in the state of punjab including utility shifting and excluding gst

Read more
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including

Read more
Construction of lvup at ch. 364.875 lhs and ch. 364.990 lhs on rob approaches and service road as safety measures for rectification of blackspot at jokatte cross morth id ka02 048) near baikampady rob in the state of karnataka

Construction of lvup at ch. 364.875 lhs and ch. 364.990 lhs on rob approaches and service road as safety measures for rectification of blackspot at jokatte cross morth id ka02 048) near baikampady rob in the state of karnataka

Read more
Consultancy services for preparation of detailed project report for indore khalghat-mp/mh border section of nh-52 in the state of madhya pradesh under capacity augmentation.

Consultancy services for preparation of detailed project report for indore khalghat-mp/mh border section of nh-52 in the state of madhya pradesh under capacity augmentation.

Read more
Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis

Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis

Read more
Balance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode

Balance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode

Read more
Calibration of relays breakers 33 kv gis panel at shankar vihar sub station repair replacement of worn out spares of 33/11kv switch gear ht 33/11kv cable 110v/52v/24v battery banks maintain to outdoor transformer ct pt la line diffrential relays pr

Calibration of relays breakers 33 kv gis panel at shankar vihar sub station repair replacement of worn out spares of 33/11kv switch gear ht 33/11kv cable 110v/52v/24v battery banks maintain to outdoor transformer ct pt la line diffrential relays pr

Read more
S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise