Tender Details

Particulars Details
Title
01/Nit/Ee/Bfd Ii/Agt/2024 25
Description
Construction Of 17 Nos. Forward Bo Ps (14 Nos. Company Level And 3 Nos. Bops Platoon Level) In The State Of Tripura For Border Security Force Along Indo Bangladesh Border. Sh: C/O 2 Nos. Company Level Bop At Simna Ii And Sewaram Para Including Electrification, Installation I/C Compound Lights Service Connection To Buildings Package Ii. Sw: Providing Services Of Four Wheel Drive Inspection Vehicle Under Ae Ii, Bfd Ii For Bop Works.
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 81323
Reference
Number
01/NIT/EE/BFD-II/AGT/2024-25
Tender Fee 0
EMD 18939
Tender Value
Place
Link https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642438313332332430312f4e49542f45452f4246442d49492f4147542f323032342d3235
Start Date July 09, 2024 17:26
End Date

16/07/2024 ( Expired 356 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
02/ee(e)/ae(e)/bfesd-i/sil/2025-26 (recall 1)

Construction of 17 nos. forward bops (14 nos. company level 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. (sw: hiring of vehicle for site inspection for the office of the executive engineer(e), border fencing electrical division-vii, cpwd, silchar, assam).

Read more
02/ee(e)/ae(e)/bfesd-i/sil/2025-26

Construction of 17 nos. forward bops (14 nos. company level 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. (sw: hiring of vehicle for site inspection for the office of the executive engineer(e), border fencing electrical division-vii, cpwd, silchar, assam).

Read more
12/nit/ee/bfd-iii/agt/2024-25

Construction of 17 nos. forward bops ( 14 nos company level and 3 nos. bops platoon level) in the state of tripura along indo bangladesh border.sh. providing inspection vehicle for sub division-iii, sabroom.

Read more
08/nit/ee/bfd-ii/2024-25(2nd call)

Con of border security fencing from phase ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh between bp. no. 328/4-s to 332/7-s and 347/2-s to 355/2-s (27.709 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo bangladesh border in the district of uttar dinajpur, west bengal (package-iv) in epc mode-iii. sw -providing services of sel driven inspection vehicle like toyota innova crysta or equivalent on monthly hire basis for government duty of superintending engineer, bfc-i, ibbz-i, cpwd, siliguri, west bengal.

Read more
08/nit/ee/bfd-ii/2024-25

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh between bp. no. 328/4-s to 332/7-s and 347/2-s to 355/2-s (27.709 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.)along indo bangladesh border in the district of uttar dinajpur, west bengal package-iv in epc mode iii. sw providing services of sel driven inspection vehicle like toyota innova crysta or equivalent on monthly hire basis for government duty of superintending engineer, bfc-i, ibbz-i, cpwd, siliguri, west bengal.

Read more
13/nit/ee/bfd-ii/agt/2024-25

Construction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh:- c/o 1 no. company level bop at sanatan bop including internal electrical installation including compound lights service connection to buildings. (package-viii). sw:- providing various services of manpower in division office and sub-division offices under border fencing division-ii, cpwd, agartala.

Read more
12/ee/nit/bfd-vii/2024-25

Construction of 509 border out posts (bops) for border security force (bsf) along the indo-bangladesh border (ibb) and the indo-pakistan border (ipb). sh: c/o 129 bops in west bengal sector, construction of 02 bops for bsf along indo-bangladesh border (ibb) sh: c/o bop sovapur tent post (platoon level) in murshidabad district in the state of west bengal i/c internal water supply, sanitary installation and electrical works.

Read more
11/nit/ee/bfd-ii/agt/2024-25

Construction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh- c/o 2 nos. company level bop at simna-ii and sewaram para including electrification, installation including compound lights and service connection to buildings (package-ii). sw- providing inspection vehicle for division office.

Read more
06/ee/bfd-ii/bfsd-iii/2024-25

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km). sh -in various stretches from bp. no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bop, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc) along indo-bangladesh border in the district of uttar dinajpur, west bengal(package-v) in epc mode-iii. sw-providing services of one sel driven inspection vehicle for office duty of the assistant engineer, bfsd-islampur, ibbz-i, cpwd, islampur under bfd-ii, islampur, uttar dinajpur.

Read more
03/ee/bfd-ii/bfsd-ii/2024-25

Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh- in various stretches from bp. no. 355/2-s to 357/1-s(4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo-bangladesh border in the district of uttar dinajpur, west bengal (package-v) in epc mode-iii. sw- providing services of one sel driven inspection vehicle for office duty of executive engineer, bfd-ii, ibbz-i, cpwd, islampur, uttar dinajpur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise