Tender Details
Particulars | Details |
---|---|
Title |
Works Contract For The Provision Of New Earth Pit With Earth Mat In 110 Kv Chidambaram Ss In Cuddalore Edc
|
Description |
Works Contract For The Provision Of 39 Nos Of New Earth Pit With Earth Mat In 110 Kv 33 Kv And 11 Kv Sides In Parallel To Existing Earth Mat At 110 Kv Chidambaram Ss In Cuddalore Edc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_559577_1 |
Reference Number |
10/2025-26 Dt.17.05.2025 |
Tender Fee | 0 |
EMD | 8400 |
Tender Value | |
Place | Cuddalore |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=668277 |
Start Date | May 19, 2025 21:30 |
End Date |
03/06/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreTariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Tariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Read moreT-2324 design, detailed engg, supply,etc of 400/230-110kv ais ss with icts, switchgears, controlpanels, sas, controlroom and civil works at samugarengapuram on total turnkey under package1 of gec2 funded by mnre and kfw
T-2324 design, detailed engg, supply,etc of 400/230-110kv ais ss with icts, switchgears, controlpanels, sas, controlroom and civil works at samugarengapuram on total turnkey basis under package1 of gec2 funded by mnre and kfw
Read moreConsulting firm for preparation of detailed project report for head works for water supply improvement in new ramnagar town of madhya pradesh
Consulting firm for preparation of detailed project report for head works for water supply improvement in new ramnagar town of madhya pradesh
Read moreEstablishment of 400/230kv ais ss with 2nos. 400kvbays,4nos. 230kv feederbays, 2x500mva,400/230kv auto transformers,kiosk buildings allied civil works at ariyalur 765/400kv ais ss,kallakurichi edc,villupuram operation circle on total turnkey basis.
Establishment of 400/230kv ais ss with 2nos. 400kvbays,4nos. 230kv feederbays, 2x500mva,400/230kv auto transformers,kiosk buildings allied civil works at ariyalur 765/400kv ais ss,kallakurichi edc,villupuram operation circle on total turnkey basis.
Read moreCompletion of incomplete works for provision of 36 permanent living in officers accn at afs carnicobar
Completion of incomplete works for provision of 36 permanent living in officers accn at afs carnicobar
Read moreConstruction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Read moreof your Industry type