Tender Details
Particulars | Details |
---|---|
Title |
Mtc. And Repair Of Road Including Pucca Drain From The House Of Sunil Debnath To Madhu Shil House At Gunjaria Tilla, Under Jurisdiction Of Central Viii Sub Division Pwd R And B Under Amc Ward No.37 For The Year 2024 25 Sh Patch Soling, Patch Wbm, Car
|
Description |
Mtc. And Repair Of Road Including Pucca Drain From The House Of Sunil Debnath To Madhu Shil House At Gunjaria Tilla, Under Jurisdiction Of Central Viii Sub Division Pwd R And B Under Amc Ward No.37 For The Year 2024 25 Sh Patch Soling, Patch Wbm, Car
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2024_CEPWD_48234_1 |
Reference Number |
48/DNIT/EE-V/AGT/PWD/2023-24 |
Tender Fee | 1000 |
EMD | 48457 |
Tender Value | |
Place | AGARTALA |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=49041 |
Start Date | March 07, 2024 14:30 |
End Date |
26/03/2024 ( Expired 392 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fdr of various roads under the jurisdiction of teliamura sub division no-ii during the year 25-26 /sh- flat soling, paver block pitching, patch metalling, carpetting etc.
Fdr of various roads under the jurisdiction of teliamura sub division no-ii during the year 25-26 /sh- flat soling, paver block pitching, patch metalling, carpetting etc.
Read moreFdr of various roads under the jurisdiction of teliamura sub division no-i during the year 25-26 /sh- flat soling, paver block pitching, patch metalling, carpetting etc.
Fdr of various roads under the jurisdiction of teliamura sub division no-i during the year 25-26 /sh- flat soling, paver block pitching, patch metalling, carpetting etc.
Read moreFdr of various roads under the jurisdiction of kalyanpur pwd(randb) sub-division. / sh- brick soling, earth filling, patch metalling, re-carpeting, cd etc during the year 2025-26.
Fdr of various roads under the jurisdiction of kalyanpur pwd(randb) sub-division. / sh- brick soling, earth filling, patch metalling, re-carpeting, cd etc during the year 2025-26.
Read moreA/r and m/o road under swr-ii, pwd, during 2025-26 (sh- repair/replacement of defective retro reflective overhead signage board sheet under jurisdiction of sub-division-1, sub-division-2, sub-division-3, sub-division-4, sub-division-5).
A/r and m/o road under swr-ii, pwd, during 2025-26 (sh- repair/replacement of defective retro reflective overhead signage board sheet under jurisdiction of sub-division-1, sub-division-2, sub-division-3, sub-division-4, sub-division-5).
Read moreMtc. of road from kanchanpur-machmara road to dharmankur buddha bihar, ch0.00 km to ch0.100 km(length0.100 km), under jampui hill sub-division, pwd(rnb) during the year 2025-2026/sh maintenance of earthen shoulder, rcc drain, wbm-3,tack coat, carpet
Mtc. of road from kanchanpur-machmara road to dharmankur buddha bihar, ch0.00 km to ch0.100 km(length0.100 km), under jampui hill sub-division, pwd(rnb) during the year 2025-2026/sh maintenance of earthen shoulder, rcc drain, wbm-3,tack coat, carpet
Read moreMaintenance of road from td road to assam border via west radhakishorepur road from ch. 0.00 km to 1.00 km length 1.00 km under damcherra sub-division pwd rand b during the year 2025 26. sh landslide clearing, pot holes repairing, patch carpeting,
Maintenance of road from td road to assam border via west radhakishorepur road from ch. 0.00 km to 1.00 km length 1.00 km under damcherra sub-division pwd rand b during the year 2025 26. sh landslide clearing, pot holes repairing, patch carpeting,
Read moreMaintenance of road from td road to assam border under damcherra sub division pwd r and b during the year 2025 26 sh surface drains, pucca drains, cd s wing wall, cd and landslide clearance, paver block, pucca drain etc.
Maintenance of road from td road to assam border under damcherra sub division pwd r and b during the year 2025 26 sh surface drains, pucca drains, cd s wing wall, cd and landslide clearance, paver block, pucca drain etc
Read moreMaintenance of road from damcherra to ballukcherra road at ch. 12.00 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, pucca drain,gsb,wbm 3 etc.
Maintenance of road from damcherra to ballukcherra road at ch. 12.00 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, pucca drain,gsb,wbm 3 etc.
Read moreWidening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.
Widening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.
Read moreMaintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para at ch.1.20km l s under damcherra sub division, pwd r and b during the year 2025 2026 sh patchmetalling, carpeting. seal coating,rcc retaining wall, wbm 3, pavers
Maintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para at ch.1.20km l s under damcherra sub division, pwd r and b during the year 2025 2026 sh patchmetalling, carpeting. seal coating,rcc retaining wall, wbm 3, pavers
Read moreof your Industry type