Tender Details

Particulars Details
Title
Pumping Station To 01no., 15 K W New Service Connection At Seep Kolar Link Project.V New Service Connection At Seep Kolar Link Project.
Description
Pumping Station To 01no., 15 K W New Service Connection At Seep Kolar Link Project.
Organisation Government of Madhya Pradesh
Tender Id 2023_WRD_308084_1
Reference
Number
1029/2023-24/Einc/Etendering/ dt.22-09-2023
Tender Fee 5000
EMD 46000
Tender Value -
Place Bhopal
Link
View Original Tender Notice

https://mptenders.gov.in

Start Date October 01, 2023 16:00
End Date
Expired 20/12/2023

Expired 1030 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction / connection of sewage line of phase-1b near annapurna mess to phase-1c pumping station at iit ropar

Construction / connection of sewage line of phase-1b near annapurna mess to phase-1c pumping station at iit ropar

Read more
Construction of a meter room for releasing an electricity connection of 3287 kw load to ensure smooth power supply to major dhyan chand state sports university salawa, meerut.

Construction of a meter room for releasing an electricity connection of 3287 kw load to ensure smooth power supply to major dhyan chand state sports university salawa, meerut.

Read more
Complete repairing/rewinding of 3 phase marathon make induction motor, 6.6 kv, 750 kw, 1492 rpm, sl. no. 3f660895/2 failed during operation in the deep mine pumping zone of rajmahal ocp.

Complete repairing/rewinding of 3 phase marathon make induction motor, 6.6 kv, 750 kw, 1492 rpm, sl. no. 3f660895/2 failed during operation in the deep mine pumping zone of rajmahal ocp.

Read more
Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (200 kw ) on rooftop / on ground or suitable location in the premises of different stages of nagthat pumping w/s scheme

Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (200 kw ) on rooftop / on ground or suitable location in the premises of different stages of nagthat pumping w/s scheme

Read more
Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (210 kw ) on rooftop / on ground or suitable location in the premises of different stages of akri barjula pumping w/s scheme

Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (210 kw ) on rooftop / on ground or suitable location in the premises of different stages of akri barjula pumping w/s scheme

Read more
Work of enchacement of 200 kva sapna habitat dtc to 400 kva in order to release 29 nos of ltd service connection for a total load of 230 kw sucorro bardez goa under the jurisidiction of sub division ii porvorim division vi mapusa

Work of enchacement of 200 kva sapna habitat dtc to 400 kva in order to release 29 nos of ltd service connection for a total load of 230 kw sucorro bardez goa under the jurisidiction of sub division ii porvorim division vi mapusa

Read more
Bush set,pressure foot assembly,crank connecting rod,feed dog,feed rocker,foot switch element,looper,lever for looper drive eccentric,looper drive eccentric assembly,looper holder,screw set for stitching machine,crank shaft for stitching machine,feed drive eccentric assembly,foot switch complete,return roller shaft,split pin size 1n8inch x 1n2inch,wooden slate,carriage bolt complete for conveyor,carriage bolt complete 3n8inchx 2inch,ms roller for stacker,ms slate for stacker,looper rocker assembly,thread tension assembly,shell,return roller,split pin size 1n8inch x 1inch,needle lever assembly,link assembly for connection,uhm slate,uhm conveyor link,uhm conveyor link attachment,ball joint assembly complete,complete holder for looper connection,washer,throat plate,needle gb 250,ms return roller for conveyor,ms chain for conveyor,needle bar connection,looper carrier head clamp,looper eccentric connection

Bush set,pressure foot assembly,crank connecting rod,feed dog,feed rocker,foot switch element,looper,lever for looper drive eccentric,looper drive eccentric assembly,looper holder,screw set for stitching machine,crank shaft for stitching machine,feed drive eccentric assembly,foot switch complete,return roller shaft,split pin size 1n8inch x 1n2inch,wooden slate,carriage bolt complete for conveyor,carriage bolt complete 3n8inchx 2inch,ms roller for stacker,ms slate for stacker,looper rocker assembly,thread tension assembly,shell,return roller,split pin size 1n8inch x 1inch,needle lever assembly,link assembly for connection,uhm slate,uhm conveyor link,uhm conveyor link attachment,ball joint assembly complete,complete holder for looper connection,washer,throat plate,needle gb 250,ms return roller for conveyor,ms chain for conveyor,needle bar connection,looper carrier head clamp,looper eccentric connection

Read more
Wiper arm,ac filter,adapter straight pipe to fuel,gear lever kit,air filter,oil filter,fuel filter,bush king pin,door handle,gasket,link rod,suspension bush kit,fan belt,inlet hose,bypass connection hose,center bolt,bush set complete,leaf

Wiper arm,ac filter,adapter straight pipe to fuel,gear lever kit,air filter,oil filter,fuel filter,bush king pin,door handle,gasket,link rod,suspension bush kit,fan belt,inlet hose,bypass connection hose,center bolt,bush set complete,leaf

Read more
Fuse hrc porcelain complete assly. with fuse base for front connection fuse link 16 amps 500v ac (delayed action duty type d-ii with alternative shape) fuse carrier gauge piece and coller ring to is:8187 of 1976 c&d no. 5111/f-341/656 & 657.each unit should be emboss/engraved with makers neme month year & batch no. of manufacturing at a conspicious place.

Fuse hrc porcelain complete assly. with fuse base for front connection fuse link 16 amps 500v ac (delayed action duty type d-ii with alternative shape) fuse carrier gauge piece and coller ring to is:8187 of 1976 c&d no. 5111/f-341/656 & 657.each unit should be emboss/engraved with makers neme month year & batch no. of manufacturing at a conspicious place.

Read more
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.

Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise