Tender Details
Particulars | Details |
---|---|
Title |
A/R And M/O On Kharuni To Lodimajra Road In Km 2/00 To 5/00 (Sh P/L Patch Work (Mss) In Km 2/00 To 5/00) Under Mmsrry 3rd Call
|
Description |
A/R And M/O On Kharuni To Lodimajra Road In Km 2/00 To 5/00 (Sh P/L Patch Work (Mss) In Km 2/00 To 5/00) Under Mmsrry 3rd Call
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_105304_1 |
Reference Number |
NIT 938-42 dated 8-05-2025 |
Tender Fee | 350 |
EMD | 7500 |
Tender Value | |
Place | Nalagarh |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=154265 |
Start Date | May 14, 2025 15:40 |
End Date |
21/05/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreStrengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreCs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Cs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Read moreStrengthening work by bm/ bc of ghattugad-silogi-gumkhal lansdowne rikhanikhal bironkhal sh-51 motor road km.137.00 to 166.00 in lansdowne constituency of pauri garhwal district under crif.
Strengthening work by bm/ bc of ghattugad-silogi-gumkhal lansdowne rikhanikhal bironkhal sh-51 motor road km.137.00 to 166.00 in lansdowne constituency of pauri garhwal district under crif.
Read moreUnder state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreof your Industry type