Tender Details

About Tender

🔥 Fire Hose Procurement Opportunity For Mrs, Rgm 🔥 The Information Technology Electronics And Communication Department, Telangana, On Behalf Of The State Government, Is Seeking Bids For The Procurement Of 4 Layer Extruded Rubber Lay Flat Fire Hoses. These Hoses Are Destined For Use At The Medak Regional Stockyard (Mrs), Rajiv Gandhi Nagar (Rgm). 📅 Bid Submission Deadline: April 10, 2024, At 12:00 Am (Midnight) Interested Bidders Should Provide Detailed Specifications, Pricing, And Delivery Schedules For The Fire Hoses Required. This Is A Unique Opportunity For Suppliers To Contribute To The Safety Infrastructure Of Critical State Facilities. Keywords: 4 Layer Fire Hose, Procurement, Extruded Rubber, Lay Flat, Fire Hire, Medak Regional Stockyard, Rajiv Gandhi Nagar, Telangana Government, It & Electronics Department, State Govt. And Ut Tender
Particulars Details
Title
4 Layer Fire Hose
Description
Procurement Of 4 Layer Extruded Rubber Lay Flat Fire Hire For Use At Mrs, Rgm
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 511121
Reference
Number
ER223O0238
Tender Fee 0
EMD 0
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date March 22, 2024 00:30
End Date

10/04/2024 ( Expired 432 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Procurement of eax/fire extinguisher carts

Procurement of eax/fire extinguisher carts

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise