Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Ntpc Limited Procurement Of Main Turbine Valves Servomotor Spares 🔧 Ntpc Limited, A Leading Public Sector Undertaking, Is Initiating A Procurement Process For The Supply Of Spares For Main Turbine Valves Servomotors In Stage Ii At The Muzaffarpur Thermal Power Station (Mtps Kanti). 📅 Submission Deadline: May 29, 2024, 4:00 Pm (Ist) Tender Fees: Nil Emd: Nil Suppliers Are Requested To Provide Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, To Meet The Stringent Requirements Of Mtps Kanti. Keywords: Ntpc Limited, Main Turbine Valves, Servomotor Spares, Muzaffarpur Thermal Power Station, Procurement, Public Sector UndertakingParticulars | Details |
---|---|
Title |
Procurement Of Spares Of Main Turbine Valves Servomotors In Stage Ii At Mtps Kanti
|
Description |
Procurement Of Spares Of Main Turbine Valves Servomotors In Stage Ii At Mtps Kanti
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | 2024_NTPC_87067_1 |
Reference Number |
NTPC/USSC-CPG3/9900280642 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Muzaffarpur Thermal Power Station |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=90286 |
Start Date | May 22, 2024 18:35 |
End Date |
29/05/2024 ( Expired 384 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreProcurement of mtu main engine rkit 25 spares
Procurement of mtu main engine rkit 25 spares
Read moreEngaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreCs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Cs for dpr for (i) development of gf northern hamirpur bypass of 2l/ps kohli to chilbahal in shimla mataur sec of nh103 (ii) upgrade/develop/widening of 2l/ps to 4l/ps from end of hamirpur bypass chilbahal to bhangbar sec new nh03 n nh303 in hp pkg4
Read morePreparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu
Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 9 gummidipoondi, tiruttani, sholinghur, jolarpettai, maduranthagam, thirukazhukundram
Read morePreparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu package 9
Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 1 punjai puliyampatti, bhavanisagar, sathyamangalam, bhavani
Read moreProvn of connecting road between kv-ii location in binnaguri (s) to telipara-ii location under military station ge (s) binnaguri
Provn of connecting road between kv-ii location in binnaguri (s) to telipara-ii location under military station ge (s) binnaguri
Read moreof your Industry type