Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Top Ring (Top Pressing Ring As Per Drg. No. 34647701020 Rev 01) .
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2025/B/6058207 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 15, 2025 19:37 |
| End Date |
Expired
25/03/2025
Expired 565 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
SURENDRA COMPOSITES PRIVATE LIMITED
5661000
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AGYA ENTERPRISES | Make : OEM Model : DEHONIT Title : TOP RING (TOP PRESSING RING AS PER DRG. NO. 34647701020 REV 01) . | 24-03-2025 10:16:55 | MII MSE | Qualified |
| 2 | ENPAY TRANSFORMER COMPONENTS INDIA PRIVATE LIMITED | Make : ENPAYBOARD Model : TOP RING Title : TOP RING (TOP PRESSING RING AS PER DRG. NO. 34647701020 REV 01) . | 24-03-2025 10:32:21 | MII | Qualified |
| 3 | SURENDRA COMPOSITES PRIVATE LIMITED | Make : Surendra Composites Pvt. Ltd. Model : Surendra Composites pvt. Ltd. Title : TOP RING (TOP PRESSING RING AS PER DRG. NO. 34647701020 REV 01) . | 24-03-2025 17:23:58 | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | SURENDRA COMPOSITES PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) | Item Categories : TOP RING (TOP PRESSING RING AS PER DRG. NO. 34647701020 REV 01) . | 4797457.63 | L1 |
| 2 | AGYA ENTERPRISES (MSE,MII)( MSE Social Category:General ) | Item Categories : TOP RING (TOP PRESSING RING AS PER DRG. NO. 34647701020 REV 01) . | 7020533.90 | L2 |
| 3 | ENPAY TRANSFORMER COMPONENTS INDIA PRIVATE LIMITED | Item Categories : TOP RING (TOP PRESSING RING AS PER DRG. NO. 34647701020 REV 01) . | 14152500.00 | L3 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| TOP RING (TOP PRESSING RING AS PER DRG. NO. 34647701020 REV 01) . | Surendra Composites Pvt. Ltd. | Surendra Composites pvt. Ltd. | 9 | ₹ 5661000.000 |
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreProcurement of 27.00xr49 radial tyres with o ring for komatsu hd785-7 model 100t dumpers working in ocps.
Procurement of 27.00xr49 radial tyres with o ring for komatsu hd785-7 model 100t dumpers working in ocps.
Read moreTggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Tggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreProcurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.
Procurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type