Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Slope Stabilization Using Soil Nailing Method In Km.8 4 Of Kuppanur Kottachedu Valavanthi Road M845
|
| Description |
Slope Stabilization Using Soil Nailing Method
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_HWAY_396680_1 |
|
Reference Number |
TN-22/2023-2024/SDO, DT.04.12.2023 |
| Tender Fee | 0 |
| EMD | 34000 |
| Tender Value | |
| Place | DE H C and M Salem |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | December 08, 2023 00:00 |
| End Date |
Expired
26/12/2023
Expired 919 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km
Restoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreProvn of 02 x toilet blocks consisting 8 toilets for girls and boys each at children school (sr wing) kanpur cantt and provision of 01 x toilet adjacent to bldg no p-4 in cqa (gs) kanpur at cqa (gs) under ge (i) kanpur
Provn of 02 x toilet blocks consisting 8 toilets for girls
 and boys each at children school (sr wing) kanpur cantt
 and provision of 01 x toilet adjacent to bldg no p-4 in cqa
 (gs) kanpur at cqa (gs) under ge (i) kanpur
Read moreUnder district sultanpur, construction of interlocking road from haripur-bharkhare to the house of wrestler veer baba to abhimanyu verma house in village alipur under khand bhadaiya, lot no 4
Under district sultanpur, construction of interlocking road from haripur-bharkhare to the house of wrestler veer baba to abhimanyu verma house in village alipur under khand bhadaiya, lot no 4&#x0d
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read moreSlope stabilisation using soil nailing method at km 0/8, 1/6 of ketty palada selas road
Slope stabilisation using soil nailing method at km 0/8, 1/6 of ketty palada selas road
Read moreSlope stabilisation using soil nailing method at km 0/8, 1/6 of ketty palada selas road
Slope stabilisation using soil nailing method at km 0/8, 1/6 of ketty palada selas road
Read moreSlope stabilisation using soil nailing method at km 12/6 of coonoor kattabettu road
Slope stabilisation using soil nailing method at km 12/6 of coonoor kattabettu road
Read moreof your Industry type