Tender Details
Particulars | Details |
---|---|
Title |
General Maintenance Works To Various Bridges Under Alappuzha Section Maintenance Works To Kumbalangi Bridge And Arookutty Bridge In Aroor Lac And Kattachira Bridge In Cherthala Lac General Civil Work
|
Description |
General Maintenance Works To Various Bridges Under Alappuzha Section Maintenance Works To Kumbalangi Bridge And Arookutty Bridge In Aroor Lac And Kattachira Bridge In Cherthala Lac General Civil Work
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_724006_1 |
Reference Number |
PWD/BR/TR/7409/2023_5_1_1/RC 1/1 |
Tender Fee | 2760 |
EMD | 29017 |
Tender Value | |
Place | Alappuzha cherthala |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1149382 |
Start Date | January 08, 2025 22:30 |
End Date |
15/01/2025 ( Expired 127 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDensification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.377.000 to km.462.164 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Densification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.377.000 to km.462.164 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Read moreCa no. ge af no.1/gur-20/2025-26 comprehensive (b/r) maintenance works including joinery works incl upvc doors and windows in building no p/144 to p/153 at sekhon vihar area at af stn palam, under ge (af) gurgaon no 1
Ca no. ge af no.1/gur-20/2025-26 comprehensive (b/r) maintenance works including joinery works incl upvc doors and windows in building no p/144 to p/153 at sekhon vihar area at af stn palam, under ge (af) gurgaon no 1
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreRequest for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Read moreFor special repair of various rural link road in mc dakala compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
For special repair of various rural link road in mc dakala compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
Read moreof your Industry type